Schedule risk analysis of infrastructure projects: A hybrid dynamic approach

被引:55
|
作者
Xu, Xiaoxiao [1 ,2 ]
Wang, Jiayuan [3 ]
Li, Clyde Zhengdao [3 ]
Huang, Wenke [3 ]
Xia, Nini [4 ]
机构
[1] Swinburne Univ Technol, Dept Civil & Construct Engn, Hawthorn, Vic, Australia
[2] Swinburne Univ Technol, Ctr Sustainable Infrastruct, Hawthorn, Vic, Australia
[3] Shenzhen Univ, Coll Civil Engn, Shenzhen, Peoples R China
[4] Southeast Univ, Sch Civil Engn, Nanjing, Jiangsu, Peoples R China
基金
中国国家自然科学基金;
关键词
Infrastructure project; Schedule risk; Hybrid dynamic approach; System dynamics; Discrete event simulation; DISCRETE-EVENT SIMULATION; PREFABRICATION HOUSING PRODUCTION; SYSTEM DYNAMICS; CONSTRUCTION PROJECTS; MANAGEMENT STRATEGIES; HONG-KONG; MODEL; ARCHITECTURE; IMPACTS; WASTE;
D O I
10.1016/j.autcon.2018.07.026
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Schedule risk is a major concern in infrastructure project management. Existing studies have proposed several models for schedule risk analysis, but few efforts have been made on the dynamics and uncertainty of risks and the generality and practicability of the model. To fill the research gaps, this study develops a hybrid dynamic approach for investigating the effect of risks on infrastructure project schedule performance. This approach combines system dynamics (SD) and discrete event simulation (DES) which have mainly been used to analyze the macroscopic and microcosmic construction issues in isolation, respectively. The model is then verified by data which is collected from a bridge construction project. As an application example, the effect of four selected risks on the schedule was explored. The results show that the proposed SD-DES model could be ease of modifying the model to reflect real situation, performing various sensitivity and uncertainty analysis, and showing simulation results more effectively.
引用
收藏
页码:20 / 34
页数:15
相关论文
共 50 条
  • [41] Schedule Delay Risk Analysis in Construction Projects with a Simulation-Based Expert System
    Koulinas, Georgios K.
    Xanthopoulos, Alexandros S.
    Tsilipiras, Thomas T.
    Koulouriotis, Dimitrios E.
    BUILDINGS, 2020, 10 (08)
  • [42] An Architectural Approach to Requirements Engineering for Infrastructure Projects
    Silmon, Joe
    Evans, Rhianne
    Brownsword, Mike
    Nicholson, David
    SYSTEMS ENGINEERING, 2015, 18 (03) : 300 - 309
  • [43] Detection of schedule delay risk of empirical construction projects
    Tsegay GEBREHIWET
    Hanbin LUO
    Frontiers of Engineering Management, 2018, 5 (02) : 251 - 267
  • [44] Analysis of Project Failure Factors for Infrastructure Projects in Saudi Arabia: A Multivariate Approach
    Ikediashi, Dubem I.
    Ogunlana, Stephen O.
    Alotaibi, Abdulaziz
    JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2014, 19 (01) : 35 - 52
  • [45] Synergistic Approach to the Management of Transport Infrastructure Projects
    Petrov, Aleksandr
    Geraskina, Inna
    12TH INTERNATIONAL CONFERENCE - ORGANIZATION AND TRAFFIC SAFETY MANAGEMENT IN LARGE CITIES SPBOTSIC-2016, 2017, 20 : 499 - 504
  • [46] Uncertainty evaluation with fuzzy schedule risk analysis model in activity networks of construction projects
    Okmen, O.
    Oztas, A.
    JOURNAL OF THE SOUTH AFRICAN INSTITUTION OF CIVIL ENGINEERING, 2014, 56 (02) : 9 - 20
  • [47] A budget management approach for societal infrastructure projects
    Nishijima, Kazuyoshi
    Faber, Michael H.
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2009, 5 (01) : 41 - 47
  • [48] The challenge of data in analysis for infrastructure projects
    Lennon, Andrew
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-ENGINEERING AND COMPUTATIONAL MECHANICS, 2020, 173 (01) : 3 - 10
  • [49] Equipment workspace analysis in infrastructure projects
    Hammad, Amin
    Zhang, Cheng
    Al-Hussein, Mohamed
    Cardinal, Germain
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2007, 34 (10) : 1247 - 1256
  • [50] A New Approach to Analysis of Green Risk in Construction Projects
    Zhang, Xian-feng
    Li, Hui-qiang
    He, Yong-fang
    Liu, Hai-liang
    EIGHTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, VOLS I-III, 2009, : 2248 - 2253