Schedule risk analysis of infrastructure projects: A hybrid dynamic approach

被引:55
|
作者
Xu, Xiaoxiao [1 ,2 ]
Wang, Jiayuan [3 ]
Li, Clyde Zhengdao [3 ]
Huang, Wenke [3 ]
Xia, Nini [4 ]
机构
[1] Swinburne Univ Technol, Dept Civil & Construct Engn, Hawthorn, Vic, Australia
[2] Swinburne Univ Technol, Ctr Sustainable Infrastruct, Hawthorn, Vic, Australia
[3] Shenzhen Univ, Coll Civil Engn, Shenzhen, Peoples R China
[4] Southeast Univ, Sch Civil Engn, Nanjing, Jiangsu, Peoples R China
基金
中国国家自然科学基金;
关键词
Infrastructure project; Schedule risk; Hybrid dynamic approach; System dynamics; Discrete event simulation; DISCRETE-EVENT SIMULATION; PREFABRICATION HOUSING PRODUCTION; SYSTEM DYNAMICS; CONSTRUCTION PROJECTS; MANAGEMENT STRATEGIES; HONG-KONG; MODEL; ARCHITECTURE; IMPACTS; WASTE;
D O I
10.1016/j.autcon.2018.07.026
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Schedule risk is a major concern in infrastructure project management. Existing studies have proposed several models for schedule risk analysis, but few efforts have been made on the dynamics and uncertainty of risks and the generality and practicability of the model. To fill the research gaps, this study develops a hybrid dynamic approach for investigating the effect of risks on infrastructure project schedule performance. This approach combines system dynamics (SD) and discrete event simulation (DES) which have mainly been used to analyze the macroscopic and microcosmic construction issues in isolation, respectively. The model is then verified by data which is collected from a bridge construction project. As an application example, the effect of four selected risks on the schedule was explored. The results show that the proposed SD-DES model could be ease of modifying the model to reflect real situation, performing various sensitivity and uncertainty analysis, and showing simulation results more effectively.
引用
收藏
页码:20 / 34
页数:15
相关论文
共 50 条
  • [1] System Dynamics Approach for Investigating the Risk Effects on Schedule Delay in Infrastructure Projects
    Wang, Jiayuan
    Yuan, Hongping
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2017, 33 (01)
  • [2] A Hybrid Approach to Cost-Benefit Analysis in Transport Infrastructure Projects
    Tiep Nguyen
    Cook, Stephen
    Ireland, Vernon
    Gunawan, Indra
    2017 INTERNATIONAL CONFERENCE ON SYSTEM SCIENCE AND ENGINEERING (ICSSE), 2017, : 569 - 574
  • [3] CONSTRUCTION SCHEDULE RISK ANALYSIS - A HYBRID MACHINE LEARNING APPROACH
    Fitzsimmons, John Patrick
    Lu, Ruodan
    Hong, Ying
    Brilakis, Ioannis
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2022, 27 : 70 - 93
  • [4] A Dynamic Decision Approach for Risk Analysis in Complex Projects
    Xianguo Wu
    Yanhong Wang
    Limao Zhang
    Lieyun Ding
    Miroslaw J. Skibniewski
    Jingbing Zhong
    Journal of Intelligent & Robotic Systems, 2015, 79 : 591 - 601
  • [5] A Dynamic Decision Approach for Risk Analysis in Complex Projects
    Wu, Xianguo
    Wang, Yanhong
    Zhang, Limao
    Ding, Lieyun
    Skibniewski, Miroslaw J.
    Zhong, Jingbing
    JOURNAL OF INTELLIGENT & ROBOTIC SYSTEMS, 2015, 79 (3-4) : 591 - 601
  • [6] Application of probabilistic cost and schedule risk assessment and risk management to large infrastructure projects
    McGrath, T. C.
    Roberds, W. J.
    Keizur, A. E.
    del Olmo, A. Gutierrez
    Barbato, I.
    SAFETY AND RELIABILITY FOR MANAGING RISK, VOLS 1-3, 2006, : 2093 - +
  • [7] Schedule delay analysis of prefabricated housing production: A hybrid dynamic approach
    Li, Clyde Zhengdao
    Hong, Jingke
    Fan, Cheng
    Xu, Xiaoxiao
    Shen, Geoffrey Qiping
    JOURNAL OF CLEANER PRODUCTION, 2018, 195 : 1533 - 1545
  • [8] A dynamic approach for evaluating infrastructure projects' sustainable performance
    Yao, Hong
    Hao, Jian li
    Shen, Li yin
    Lee, Kinhang
    Proceedings of CRIOCM 2006 International Research Symposium on Advancement of Construction Management and Real Estate, Vols 1 and 2, 2006, : 39 - 50
  • [9] Temporary Works for Major Infrastructure Projects: Need for a Risk Analysis Based Approach
    Murugappan, Krishnan
    Murugappan, Vidya
    INTERNATIONAL CONFERENCE ON SUSTAINABLE INFRASTRUCTURE 2017: METHODOLOGY, 2017, : 351 - 358
  • [10] A Multiply Connected Belief Network approach for schedule risk analysis of metropolitan construction projects
    Eshtehardian, Ehsan
    Khodaverdi, Saeed
    CIVIL ENGINEERING AND ENVIRONMENTAL SYSTEMS, 2016, 33 (03) : 227 - 246