TWO-STAGE LOT SCHEDULING WITH WAITING TIME CONSTRAINTS AND DUE DATES

被引:0
|
作者
Yu, Tae-Sun [1 ]
Kim, Hyun-Jung [1 ]
Jung, Chanhwi [1 ]
Lee, Tae-Eog [1 ]
机构
[1] Korea Adv Inst Sci & Technol, Dept Ind & Syst Engn, Taejon 305701, South Korea
关键词
SINGLE-MACHINE; VARIANCE MINIMIZATION; CLUSTER TOOLS; TARDINESS; FLOWSHOP;
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
We examine a two-stage lot scheduling problem with waiting time constraints and distinct due dates. Wafer lots in diffusion or etch processes generally have due dates specified for each process stage. Some lots even have more strict time constraints that their waiting times between two or multiple stages should not exceed specified limits. We also wish to minimize the variation of the waiting times at the intermediate buffer, which is detrimental to wafer quality variability. To solve such a scheduling problem, we develop a mixed integer programming model for small problems. Also, we suggest an efficient solution procedure for large problems by adopting the earliest due date policy and propose a timing control strategy.
引用
收藏
页码:3630 / 3641
页数:12
相关论文
共 50 条
  • [21] Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production
    Ferreira, Deisemara
    Clark, Alistair R.
    Almada-Lobo, Bernardo
    Morabito, Reinaldo
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 136 (02) : 255 - 265
  • [22] A decomposition heuristic to solve the two-stage lot sizing and scheduling problem with temporal cleaning
    Alyne Toscano
    Deisemara Ferreira
    Reinaldo Morabito
    Flexible Services and Manufacturing Journal, 2019, 31 : 142 - 173
  • [23] Scheduling two-stage hybrid flow shops with parallel batch, release time, and machine eligibility constraints
    I.-Lin Wang
    Taho Yang
    Yu-Bang Chang
    Journal of Intelligent Manufacturing, 2012, 23 : 2271 - 2280
  • [24] Scheduling two-stage hybrid flow shops with parallel batch, release time, and machine eligibility constraints
    Wang, I. -Lin
    Yang, Taho
    Chang, Yu-Bang
    JOURNAL OF INTELLIGENT MANUFACTURING, 2012, 23 (06) : 2271 - 2280
  • [25] A two-stage ant colony algorithm for hybrid flow shop scheduling with lot sizing and calendar constraints in printed circuit board assembly
    Qin, Wei
    Zhuang, Zilong
    Liu, Yang
    Tang, Ou
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 138
  • [26] Reentrant two-stage multiprocessor flow shop scheduling with due windows
    Rong-Hwa Huang
    Shun-Chi Yu
    Chen-Wei Kuo
    The International Journal of Advanced Manufacturing Technology, 2014, 71 : 1263 - 1276
  • [27] Two-Stage Assembly Flowshop Scheduling Problem with Distinct Due Windows
    Chen, Feng
    Chung, Tsui-Ping
    Wang, Le
    Qiu, Meng
    2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 659 - 663
  • [28] Reentrant two-stage multiprocessor flow shop scheduling with due windows
    Huang, Rong-Hwa
    Yu, Shun-Chi
    Kuo, Chen-Wei
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 71 (5-8): : 1263 - 1276
  • [29] Lot streaming in a two-stage assembly system
    Cheng, Ming
    Sarin, Subhash C.
    ANNUAL REVIEWS IN CONTROL, 2020, 50 : 303 - 316
  • [30] Batch Scheduling Problem with Multiple Due-dates Constraints
    Mohri, Shintaro
    Masuda, Teruo
    Hiroakilshii
    INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2011, 10 (01): : 1 - 6