Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production

被引:42
|
作者
Ferreira, Deisemara [1 ]
Clark, Alistair R. [2 ]
Almada-Lobo, Bernardo [3 ]
Morabito, Reinaldo [4 ]
机构
[1] Univ Fed Triangulo Mineiro, Dept Appl Math, Uberaba, Brazil
[2] Univ W England, Dept Engn Design & Math, Bristol BS16 1QY, Avon, England
[3] Univ Porto, Fac Engn, P-4100 Oporto, Portugal
[4] Univ Fed Sao Carlos, Dept Prod Engn, BR-13560 Sao Carlos, SP, Brazil
基金
巴西圣保罗研究基金会;
关键词
Production lot-scheduling models; Asymmetric travelling salesman problem; Soft drink industry; SEQUENCE-DEPENDENT SETUP; PARALLEL MACHINES; COSTS; MODELS; TIMES; OPPORTUNITIES; EXTENSIONS; ALGORITHMS;
D O I
10.1016/j.ijpe.2011.11.028
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study deals with industrial processes that produce soft drink bottles in different flavours and sizes, carried out in two synchronised production stages: liquid preparation and bottling. Four single-stage formulations are proposed to solve the synchronised two-stage lot sizing and scheduling problem in soft drink production synchronising the first stage's syrup lots in tanks with the second stage's soft drink lots on bottling lines. The first two formulations are variants of the General Lot Sizing and Scheduling Problem (GLSP) with sequence-dependent setup times and costs, while the other two are based on the Asymmetric Travelling Salesman Problem (ATSP) with different subtour elimination constraints. All models are computationally tested and compared to the original two-stage formulation introduced in Ferreira et al. (2009), using data based on a real-world bottling plant. The results show not only the superiority of the single-stage models if compared to the two-stage formulation, but also the much faster solution times of the ATSP-based models. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:255 / 265
页数:11
相关论文
共 50 条
  • [1] Three time-based scale formulations for the two-stage lot sizing and scheduling in process industries
    Camargo, V. C. B.
    Toledo, F. M. B.
    Almada-Lobo, B.
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2012, 63 (11) : 1613 - 1630
  • [2] Synchronized Two-Stage Lot Sizing and Scheduling Problem in Automotive Industry
    Uney-Yuksektepe, Fadime
    Ozdemir, Rifat Gurcan
    [J]. OPERATIONS RESEARCH PROCEEDINGS 2011, 2012, : 477 - 482
  • [3] Heuristic approaches to solve a two-stage lot sizing and scheduling problem
    Pinho Schimidt, Talita Mariana
    Cassius Tadeu, Scarpin
    Valentim Loch, Gustavo
    Schenekemberg, Cleder Marcos
    [J]. IEEE LATIN AMERICA TRANSACTIONS, 2019, 17 (03) : 434 - 443
  • [4] LOT SIZING, DELIVERY AND SCHEDULING OF IDENTICAL JOBS IN A SINGLE-STAGE SUPPLY CHAIN
    Grunder, Olivier
    [J]. INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL, 2010, 6 (08): : 3657 - 3668
  • [5] Mixed-Integer Linear Programming Monolithic Formulations for Lot-Sizing and Scheduling of Single-Stage Batch Facilities
    Marchetti, Pablo A.
    Mendez, Carlos A.
    Cerda, Jaime
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2010, 49 (14) : 6482 - 6498
  • [6] Production lot sizing in failure prone two-stage serial systems
    Lee, SD
    Rung, JM
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 123 (01) : 42 - 60
  • [7] Production to order with random yields: Single-stage multiple lot-sizing
    GrosfeldNir, A
    Gerchak, Y
    [J]. IIE TRANSACTIONS, 1996, 28 (08) : 669 - 676
  • [8] A hybrid general lot-sizing and scheduling formulation for a production process with a two-stage product structure
    Transchel, Sandra
    Minner, Stefan
    Kallrath, Josef
    Loehndorf, Nils
    Eberhard, Ulrich
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (09) : 2463 - 2480
  • [9] A two-stage stochastic programming model for lot-sizing and scheduling under uncertainty
    Hu, Zhengyang
    Hu, Guiping
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2016, 180 : 198 - 207
  • [10] A decomposition heuristic to solve the two-stage lot sizing and scheduling problem with temporal cleaning
    Alyne Toscano
    Deisemara Ferreira
    Reinaldo Morabito
    [J]. Flexible Services and Manufacturing Journal, 2019, 31 : 142 - 173