The impact of organizational structure on time-based manufacturing and plant performance

被引:195
|
作者
Nahm, AY
Vonderembse, MA
Koufteros, XA
机构
[1] Univ Toledo, Coll Business Adm, Dept Management, Toledo, OH 43606 USA
[2] Univ Wisconsin, Dept Management & Mkt, Eau Claire, WI 54701 USA
[3] Florida Atlantic Univ, Ft Lauderdale, FL USA
关键词
organizational structure; time-based manufacturing; plant performance;
D O I
10.1016/S0272-6963(02)00107-9
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The innovation and organizational theory literatures argue that implementing radical innovation can be facilitated or hindered by the organization's structural design. As firms attempt to cope with an external environment that is changing from industrial to post-industrial, how do they implement change? This study develops a research framework that examines relationships among various structural dimensions (i.e. number of layers in the hierarchy, level of horizontal integration, locus of decision-making, nature of formalization, and level of communication), time-based manufacturing practices, and plant performance. Based on 224 responses from manufacturing firms, this study develops instruments to measure these organizational sub-dimensions using part of this sample (N = 104), and it tests the structural relationships with the remaining responses (N = 120). Results indicate that the nature of formalization, the number of layers in the hierarchy, and the level of horizontal integration have significant, direct, and positive effects on the locus of decision-making and level of communication. Locus of decision-making and the level of communication, in turn, have significant, direct, and positive effects on time-based manufacturing practices. Finally, time-based manufacturing practices have a significant, direct, and positive impact on plant performance. (C) 2003 Elsevier Science B.V All rights reserved.
引用
收藏
页码:281 / 306
页数:26
相关论文
共 50 条
  • [41] Impact of industry 4.0 technologies on lean manufacturing and organizational performance in an organization
    Clinton Pereira
    H. K. Sachidananda
    International Journal on Interactive Design and Manufacturing (IJIDeM), 2022, 16 : 25 - 36
  • [42] Time-based architecture
    Hurol, Yonca
    OPEN HOUSE INTERNATIONAL, 2006, 31 (02) : 82 - 83
  • [43] The role of manufacturing practices in mediating the impact of activity-based costing on plant performance
    Banker, Rajiv D.
    Bardhan, Indranil R.
    Chen, Tai-Yuan
    ACCOUNTING ORGANIZATIONS AND SOCIETY, 2008, 33 (01) : 1 - 19
  • [44] A delay time-based peak load control for stable performance
    Lee, Yonghwan
    Choi, Eunmi
    Min, Dugki
    PARALLEL AND DISTRIBUTED PROCESSING AND APPLICATIONS, 2006, 4330 : 329 - +
  • [45] Time-based procurement
    Li, Zhaolin
    Shao, Lusheng
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2015, 169 : 350 - 361
  • [46] Time-based ΔΣ ADCs
    Hanumolu, Pavan Kumar
    2017 IEEE CUSTOM INTEGRATED CIRCUITS CONFERENCE (CICC), 2017,
  • [47] Performance analysis of an enhanced time-based location registration scheme
    Lee, GY
    Lee, Y
    IEICE TRANSACTIONS ON COMMUNICATIONS, 2004, E87B (03) : 776 - 779
  • [48] Performance Comparison between SerDes and Time-Based Serial Links
    Rashdan, Mostafa
    El-Sayed, Fahmi
    Salman, Mohammad
    2020 7TH INTERNATIONAL CONFERENCE ON ELECTRICAL AND ELECTRONICS ENGINEERING (ICEEE 2020), 2020, : 37 - 41
  • [49] Development and visualization of time-based building energy performance metrics
    Ozkan, Aylin
    Kesik, Ted
    Yilmaz, Ayse Zerrin
    O'Brien, William
    BUILDING RESEARCH AND INFORMATION, 2019, 47 (05): : 493 - 517
  • [50] Performance analysis of two time-based coordinated checkpointing protocols
    Kavanaugh, GP
    Sanders, WH
    PACIFIC RIM INTERNATIONAL SYMPOSIUM ON FAULT-TOLERANT SYSTEMS, PROCEEDINGS, 1997, : 194 - 201