The impact of organizational structure on time-based manufacturing and plant performance

被引:195
|
作者
Nahm, AY
Vonderembse, MA
Koufteros, XA
机构
[1] Univ Toledo, Coll Business Adm, Dept Management, Toledo, OH 43606 USA
[2] Univ Wisconsin, Dept Management & Mkt, Eau Claire, WI 54701 USA
[3] Florida Atlantic Univ, Ft Lauderdale, FL USA
关键词
organizational structure; time-based manufacturing; plant performance;
D O I
10.1016/S0272-6963(02)00107-9
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The innovation and organizational theory literatures argue that implementing radical innovation can be facilitated or hindered by the organization's structural design. As firms attempt to cope with an external environment that is changing from industrial to post-industrial, how do they implement change? This study develops a research framework that examines relationships among various structural dimensions (i.e. number of layers in the hierarchy, level of horizontal integration, locus of decision-making, nature of formalization, and level of communication), time-based manufacturing practices, and plant performance. Based on 224 responses from manufacturing firms, this study develops instruments to measure these organizational sub-dimensions using part of this sample (N = 104), and it tests the structural relationships with the remaining responses (N = 120). Results indicate that the nature of formalization, the number of layers in the hierarchy, and the level of horizontal integration have significant, direct, and positive effects on the locus of decision-making and level of communication. Locus of decision-making and the level of communication, in turn, have significant, direct, and positive effects on time-based manufacturing practices. Finally, time-based manufacturing practices have a significant, direct, and positive impact on plant performance. (C) 2003 Elsevier Science B.V All rights reserved.
引用
收藏
页码:281 / 306
页数:26
相关论文
共 50 条
  • [31] Reliability evaluation for time-based stochastic manufacturing networks with time-dependent reliability
    Chang, Ping-Chen
    Huang, Cheng-Fu
    Fiondella, Lance
    QUALITY TECHNOLOGY AND QUANTITATIVE MANAGEMENT, 2024, 21 (06): : 1025 - 1041
  • [32] Time Scorecard: An integrative Performance Measurement Framework For Time-based Companies
    Cui Song
    Zhang Hong
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 9605 - 9609
  • [33] Antecedent practices, time-based performance, and business performance: A path model
    Jayaram, J
    Vickery, S
    Droge, C
    DECISION SCIENCES INSTITUTE, 1997 ANNUAL MEETING, PROCEEDINGS, VOLS 1-3, 1997, : 1347 - 1348
  • [34] The impact of supply chain complexity on manufacturing plant performance
    Bozarth, Cecil C.
    Warsing, Donald P.
    Flynn, Barbara B.
    Flynn, E. James
    JOURNAL OF OPERATIONS MANAGEMENT, 2009, 27 (01) : 78 - 93
  • [35] TIME-BASED COMPETITION
    WRENNALL, W
    MANUFACTURING ENGINEERING, 1990, 105 (04): : 136 - 136
  • [36] Time-Based Consensus
    Heydari, Hasan
    Silvestre, Guthemberg
    Larrieu, Nicolas
    Pirovano, Alain
    EURO-PAR 2019: PARALLEL PROCESSING WORKSHOPS, 2020, 11997 : 756 - 759
  • [37] A Comprehensive Overview of Additive Manufacturing Processes Through a Time-Based Classification Model
    Koltsaki, Maria
    Mavri, Maria
    3D PRINTING AND ADDITIVE MANUFACTURING, 2024, 11 (01) : 363 - 382
  • [38] TIME-BASED MACHINE FAILURE PREDICTION IN MULTI-MACHINE MANUFACTURING SYSTEMS
    Sobaszek, Lukasz
    Gola, Arkadiusz
    Swic, Antoni
    EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2020, 22 (01): : 52 - 62
  • [39] Impact of industry 4.0 technologies on lean manufacturing and organizational performance in an organization
    Pereira, Clinton
    Sachidananda, H. K.
    INTERNATIONAL JOURNAL OF INTERACTIVE DESIGN AND MANUFACTURING - IJIDEM, 2022, 16 (01): : 25 - 36
  • [40] Time-based hypercompetition
    Chung C.H.
    International Journal of Information Systems and Change Management, 2020, 12 (01): : 53 - 70