An energy-efficient multi-objective optimization for flexible job-shop scheduling problem

被引:174
|
作者
Mokhtari, Hadi [1 ]
Hasani, Aliakbar [2 ]
机构
[1] Univ Kashan, Dept Ind Engn, Fac Engn, Kashan, Iran
[2] Shahrood Univ Sci & Technol, Sch Ind Engn & Management, Shahrood, Iran
关键词
Energy consumption; Energy-efficient scheduling; Industrial processes; Scheduling problems; Multi-Objective optimization; CHAIN NETWORK DESIGN; POWER-CONSUMPTION; GENETIC ALGORITHM; MAINTENANCE; UNCERTAINTY; REDUCTION; TARDINESS; MAKESPAN; INDUSTRY; MINIMIZE;
D O I
10.1016/j.compchemeng.2017.05.004
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In recent years there has been increased concern on energy efficiency of industries. Since the scheduling problems in the shop floors are directly related to the energy consumption, an appropriate way to improve energy efficiency in industrial plants is to develop effective scheduling strategies. Hence, the aim of this paper is to design an energy-efficient scheduling in a shop floor industrial environment, i.e., flexible job shop scheduling problem (FJSP). To this end, a multi-objective optimization model is developed with three objective functions: (i) minimizing total completion time, (ii) maximizing the total availability of the system, and (iii) minimizing total energy cost of both production and maintenance operations in the FJSP. To cope with this multi-objective optimization problem, an enhanced evolutionary algorithm incorporated with the global criterion, as a multi-objective handling technique, is proposed and then performance evaluation is performed based on an extensive numerical analysis. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:339 / 352
页数:14
相关论文
共 50 条
  • [41] An Enhanced Multi-Objective Evolutionary Algorithm with Reinforcement Learning for Energy-Efficient Scheduling in the Flexible Job Shop
    Shi, Jinfa
    Liu, Wei
    Yang, Jie
    PROCESSES, 2024, 12 (09)
  • [42] Simulation Optimization of Multi-objective Flexible Job Shop Scheduling
    Wang Guicong
    Li Chuanpeng
    Cui Huanyong
    MACHINE DESIGN AND MANUFACTURING ENGINEERING II, PTS 1 AND 2, 2013, 365-366 : 602 - 605
  • [43] A Newton-based heuristic algorithm for multi-objective flexible job-shop scheduling problem
    Miguel A. Fernández Pérez
    Fernanda M. P. Raupp
    Journal of Intelligent Manufacturing, 2016, 27 : 409 - 416
  • [44] An Effective Artificial Bee Colony Algorithm for Multi-objective Flexible Job-Shop Scheduling Problem
    Zhou, Gang
    Wang, Ling
    Xu, Ye
    Wang, Shengyao
    ADVANCED INTELLIGENT COMPUTING THEORIES AND APPLICATIONS: WITH ASPECTS OF ARTIFICIAL INTELLIGENCE, 2012, 6839 : 1 - 8
  • [45] Multi-objective dynamic scheduling algorithm for flexible job-shop problem based on rule orientation
    Zhu W.
    Zhu, Wei (314560255@qq.com), 1600, Systems Engineering Society of China (37): : 2690 - 2699
  • [46] Multi-Objective Flexible Job-Shop Scheduling Problem with DIPSO: More Diversity, Greater Efficiency
    Felix Carvalho, Luiz Carlos
    Fernandes, Marcia Aparecida
    2014 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2014, : 282 - 289
  • [47] A Newton-based heuristic algorithm for multi-objective flexible job-shop scheduling problem
    Fernandez Perez, Miguel A.
    Raupp, Fernanda M. P.
    JOURNAL OF INTELLIGENT MANUFACTURING, 2016, 27 (02) : 409 - 416
  • [48] A hybrid artificial bee colony algorithm for multi-objective flexible job-shop scheduling problem
    Meng, Guan-Jun
    Chen, Xin-Hua
    Yang, Da-Chun
    Zhang, Wei
    Journal of Computers (Taiwan), 2020, 31 (05) : 224 - 235
  • [49] Scheduling of Dynamic Multi-Objective Flexible Enterprise Job-Shop Problem Based on Hybrid QPSO
    Chen, Wei
    Yang, Hong
    Hao, Yifei
    IEEE ACCESS, 2019, 7 : 127090 - 127097
  • [50] Novel approach to energy-efficient flexible job-shop scheduling problems
    Rakovitis, Nikolaos
    Li, Dan
    Zhang, Nan
    Li, Jie
    Zhang, Liping
    Xiao, Xin
    Energy, 2022, 238