Simulation Optimization of Multi-objective Flexible Job Shop Scheduling

被引:1
|
作者
Wang Guicong [1 ]
Li Chuanpeng [1 ]
Cui Huanyong [1 ]
机构
[1] Univ Jinan, Sch Mech Engn, Jinan 250022, Peoples R China
关键词
Flexible Job Shop Problem; Multiple Objective; Simulation and Optimization; Modelling; Method;
D O I
10.4028/www.scientific.net/AMM.365-366.602
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Current scheduling approach for multiple objective flexible job shop problem (FJSP) cannot construct a precise scheduling model and obtain a satisfactory scheduling result at the same time. To deal with this problem, a simulation optimization scheduling approach was presented which was composed of two basic modules: the Fast non-dominated Sorting Genetic Algorithm (NSGA-II) module and Witness simulation module. Firstly, a multi-objective mathematical model was found for FJSP and NSGA-II was applied to solve. Then, a set of Pareto optimal solution was obtained by NSGA-II module. In order to select the final solution from the Pareto optimal solution for FJSP, the simulation model was set up by Witness, every Pareto solution was as input for simulation model. Finally, the final solution can be selected according other performance indicators.
引用
收藏
页码:602 / 605
页数:4
相关论文
共 50 条
  • [1] Approach for Multi-objective Flexible Job shop scheduling
    Hui, Hongjie
    [J]. AUTOMATIC MANUFACTURING SYSTEMS II, PTS 1 AND 2, 2012, 542-543 : 407 - 410
  • [2] Dynamic scheduling on multi-objective flexible Job Shop
    Liu, Ai-Jun
    Yang, Yu
    Xing, Qing-Song
    Lu, Hui
    Zhang, Yu-Dong
    Zhou, Zhen-Yu
    Wu, Guang-Hui
    Zhao, Xiao-Hua
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2011, 17 (12): : 2629 - 2637
  • [3] Due date optimization in multi-objective scheduling of flexible job shop production
    Ojstersek, R.
    Tang, M.
    Buchmeister, B.
    [J]. ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT, 2020, 15 (04): : 481 - 492
  • [4] Flexible Job Shop Scheduling Problem Based on Multi-Objective Optimization Algorithm
    Zhang, Li
    Wang, Lu
    [J]. PROCEEDINGS OF THE 2018 INTERNATIONAL CONFERENCE ON MECHANICAL, ELECTRONIC, CONTROL AND AUTOMATION ENGINEERING (MECAE 2018), 2018, 149 : 580 - 588
  • [5] Study on Job Shop Scheduling Optimization with Multi-objective
    Ze, Tao
    Di, Liang
    Qun, Zhou
    [J]. HIGH PERFORMANCE STRUCTURES AND MATERIALS ENGINEERING, PTS 1 AND 2, 2011, 217-218 : 326 - +
  • [6] Multi-objective flexible job shop scheduling of batch production
    School of Mechatronic Engineering, Jinling Institute of Technology, Nanjing 210001, China
    不详
    [J]. Jixie Gongcheng Xuebao/Chinese Journal of Mechanical Engineering, 2007, 43 (08): : 148 - 154
  • [7] Multi-Objective Flexible Job Shop Scheduling Optimization by Means of Promethee I Method
    Guliashki, Vassil G.
    Marinova, Galia, I
    [J]. 2019 14TH INTERNATIONAL CONFERENCE ON ADVANCED TECHNOLOGIES, SYSTEMS AND SERVICES IN TELECOMMUNICATIONS (TELSIKS 2019), 2019, : 228 - 231
  • [8] Hybrid Ant Colony Multi-Objective Optimization for Flexible Job Shop Scheduling Problems
    Luo, De-Lin
    Chen, Hai-Ping
    Wu, Shun-Xiang
    Shi, Yue-Xiang
    [J]. JOURNAL OF INTERNET TECHNOLOGY, 2010, 11 (03): : 361 - 369
  • [9] Improved PSO algorithm for multi-objective optimization flexible job shop scheduling problems
    Bai, Junjie
    Wang, Ningsheng
    Tang, Dunbing
    [J]. Nanjing Hangkong Hangtian Daxue Xuebao/Journal of Nanjing University of Aeronautics and Astronautics, 2010, 42 (04): : 447 - 453
  • [10] A simulated multi-objective model for flexible job shop transportation scheduling
    Yiyi Xu
    M’hammed Sahnoun
    Fouad Ben Abdelaziz
    David Baudry
    [J]. Annals of Operations Research, 2022, 311 : 899 - 920