Energy-Efficient Single Machine Total Weighted Tardiness Problem with Sequence-Dependent Setup Times

被引:11
|
作者
Tasgetiren, M. Fatih [1 ]
Oztop, Hande [2 ]
Eliiyi, Ugur [3 ]
Eliiyi, Deniz Tursel [2 ]
Pan, Quan-Ke [4 ]
机构
[1] Yasar Univ, Dept Int Logist Management, Bornova, Turkey
[2] Yasar Univ, Dept Ind Engn, Bornova, Turkey
[3] Dokuz Eylul Univ, Dept Comp Sci, Izmir, Turkey
[4] Huazhong Univ Sci & Technol, State Key Lab, Wuhan, Hubei, Peoples R China
关键词
Energy efficient scheduling; Multi-objective optimization; Heuristic optimization; Sequence-dependent setup times; Weighted tardiness; ITERATED GREEDY ALGORITHM; LOCAL SEARCH; MINIMIZE; CONSUMPTION; MAKESPAN;
D O I
10.1007/978-3-319-95930-6_76
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Most of the problems defined in the scheduling literature do not yet take into account the energy consumption of manufacturing processes, as in most of the variants with tardiness objectives. This study handles scheduling of jobs with due dates and sequence-dependent setup times (SMWTSD), while minimizing total weighted tardiness and total energy consumed in machine operations. The trade-off between total energy consumption (TEC) and total weighted tardiness is examined in a single machine environment, where different jobs can be operated at varying speed levels. A bi-objective mixed integer linear programming model is formulated including this speed-scaling plan. Moreover, an efficient multi-objective block insertion heuristic (BIH) and a multi-objective iterated greedy (IG) algorithm are proposed for this NP-hard problem. The performances of the proposed BIH and IG algorithms are compared with each other. The preliminary computational results on a benchmark suite consisting of instances with 60 jobs reveal that, the proposed BIH algorithm is very promising in terms of providing good Pareto frontier approximations for the problem.
引用
收藏
页码:746 / 758
页数:13
相关论文
共 50 条
  • [41] Single-machine scheduling with sequence dependent setup to minimize total weighted squared tardiness
    Sun, XQ
    Noble, JS
    Klein, CM
    IIE TRANSACTIONS, 1999, 31 (02) : 113 - 124
  • [42] Earliness/tardiness scheduling for single machine with sequence dependent setup times
    Kim, Minsoo
    Seo, Wonchul
    Koh, Shiegheun
    ICIC Express Letters, 2015, 9 (12): : 3313 - 3319
  • [43] Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times
    Jeong, BongJoo
    Kim, Yeong-Dae
    COMPUTERS & OPERATIONS RESEARCH, 2014, 47 : 72 - 80
  • [44] A hybrid genetic algorithm for the single machine scheduling problem with sequence-dependent setup times
    Sioud, A.
    Gravel, M.
    Gagne, C.
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (10) : 2415 - 2424
  • [45] Minimizing tardiness on a single processor with sequence-dependent setup times: A simulated annealing approach
    Tan, Keah Choon
    Narasimhan, R.
    Omega, 1997, 25 (06): : 619 - 634
  • [46] A branch-and-bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing maximum tardiness
    Luo, Xiaochuan
    Chu, Chengbin
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 180 (01) : 68 - 81
  • [47] Minimizing tardiness on a single processor with sequence-dependent setup times: A simulated annealing approach
    Tan, KC
    Narasimhan, R
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1997, 25 (06): : 619 - 634
  • [48] Algorithms for the single machine total weighted completion time scheduling problem with release times and sequence-dependent setups
    Chou, Fuh-Der
    Wang, Hui-Mei
    Chang, Tzu-Yun
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 43 (7-8): : 810 - 821
  • [49] Algorithms for the single machine total weighted completion time scheduling problem with release times and sequence-dependent setups
    Fuh-Der Chou
    Hui-Mei Wang
    Tzu-Yun Chang
    The International Journal of Advanced Manufacturing Technology, 2009, 43 : 810 - 821
  • [50] A BB&R algorithm for minimizing total tardiness on a single machine with sequence dependent setup times
    Edward C. Sewell
    Jason J. Sauppe
    David R. Morrison
    Sheldon H. Jacobson
    Gio K. Kao
    Journal of Global Optimization, 2012, 54 : 791 - 812