共 50 条
- [31] Parallel path relinking method for the single machine total weighted tardiness problem with sequence-dependent setups Journal of Intelligent Manufacturing, 2010, 21 : 777 - 785
- [34] On the single machine scheduling problem with sequence-dependent setup times and periodic maintenance 2018 5TH INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT), 2018, : 374 - 378
- [39] Single-machine scheduling with sequence dependent setup to minimize total weighted squared tardiness IIE Transactions (Institute of Industrial Engineers), 1999, 31 (02): : 113 - 124