Optimizing the modularization of floor plans in modular construction projects

被引:15
|
作者
Almashaqbeh, Mohammad [1 ,2 ]
El-Rayes, Khaled [1 ]
机构
[1] Univ Illinois, Dept Civil & Environm Engn, Urbana, IL 61801 USA
[2] Hashemite Univ, Dept Civil Engn, Zarqa, Jordan
来源
关键词
Modularization; Prefabrication; Optimization; Modular construction cost; LAYOUT; DESIGN; ARCHITECTURE; ALGORITHM;
D O I
10.1016/j.jobe.2021.102316
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents an optimization model that enables construction planners to generate and analyze optimal tradeoffs between minimizing the total cost of modular construction projects and maximizing the functional performance of the floor plan. The model is developed in three main stages that are designed to formulate the model decision variables, objective function, and relevant constraints; implement the optimization computations using linear programming; and evaluate the model performance using a case study of a modular construction project of an office building. The results of the case study highlight the original contributions of the model to theory and its impact on practice. First, the model contributions to theory include its novel capabilities of quantifying the impact of room widths and lengths on the total modular construction cost and floor plan functional performance, identifying an optimal width and length for each room in modular construction projects from a range of feasible alternatives, and generating optimal tradeoffs between the two conflicting objectives of minimizing modular construction cost and maximizing floor plan performance. Second, the results of the case study highlight the impact of the model on practice and its ability to provide planners with much-needed support in optimizing the layout of modular construction projects in order to maximize floor plan functional performance while minimizing the total modular construction cost including its fabrication, transportation, assembly, and structural frame costs.
引用
收藏
页数:12
相关论文
共 50 条
  • [31] Critical success factors for modular integrated construction projects: A review
    Wuni, Ibrahim Yahaya
    Shen, Geoffrey Qiping
    [J]. JOURNAL OF PLANNING LITERATURE, 2022, 37 (01) : 195 - 195
  • [32] Demonstrating CrowdInside: A System for the Automatic Construction of Indoor Floor-plans
    Alzantot, Moustafa
    Youssef, Moustafa
    [J]. 2013 IEEE INTERNATIONAL CONFERENCE ON PERVASIVE COMPUTING AND COMMUNICATIONS WORKSHOPS (PERCOM WORKSHOPS), 2013, : 321 - 323
  • [33] Critical success factors for modular integrated construction projects: a review
    Wuni, Ibrahim Yahaya
    Shen, Geoffrey Qiping
    [J]. BUILDING RESEARCH AND INFORMATION, 2020, 48 (07): : 763 - 784
  • [34] Optimizing the Utilization of Shareable Equipment in Multiple Shifts for Construction Projects
    Jun, Dho Heon
    Han, Choong-Hee
    Kim, Dae-Jin
    [J]. JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2016, 15 (03) : 597 - 604
  • [35] Optimizing the planning of construction site security for critical infrastructure projects
    Said, Hisham
    El-Rayes, Khaled
    [J]. AUTOMATION IN CONSTRUCTION, 2010, 19 (02) : 221 - 234
  • [36] Optimizing Financing Cost in Construction Projects with Fixed Project Duration
    Alavipour, S. M. Reza
    Arditi, David
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (04)
  • [37] Modern management methods in the implementation of construction projects on the example of contingency plans
    Kowacka, Magdalena
    Skorupka, Dariusz
    Bekisz, Agnieszka
    Gajowiak, Dominika Dudziak
    Duchaczek, Artur
    [J]. ARCHIVES OF CIVIL ENGINEERING, 2023, 69 (02) : 111 - 122
  • [38] Challenges for Implementing Environmental Management Plans in Construction Projects: The Case of Malaysia
    Asnor, Asri Syahmi
    Al-Mohammad, Mohammad S.
    Ahmad, Saffuan Wan
    Almutairi, Saud
    Rahman, Rahimi A.
    [J]. SUSTAINABILITY, 2022, 14 (10)
  • [39] LNG construction projects, plans move ahead, buck cost pressure
    Sen, Colleen Taylor
    True, Warren R.
    [J]. OIL & GAS JOURNAL, 2007, : 20 - 25
  • [40] Requirements Regarding Structure and Level of Detail for Schedules and Sequence Plans for Construction Projects - Part 2: Application on the Realization of Construction Projects
    Zimmermann, J.
    Greitemann, P.
    [J]. BAUINGENIEUR, 2016, 91 : 18 - 25