Planning for Mining Operations with Time and Resource Constraints

被引:0
|
作者
Lipovetzky, Nir [1 ]
Burt, Christina N. [1 ]
Pearce, Adrian R. [1 ]
Stuckey, Peter J. [1 ]
机构
[1] Univ Melbourne, Comp & Informat Syst, Parkville, Vic, Australia
基金
澳大利亚研究理事会;
关键词
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
We study a daily mine planning problem where, given a set of blocks we wish to mine, our task is to generate a mining sequence for the excavators such that blending resource constraints are met at various stages of the sequence. Such time-oriented resource constraints are not traditionally handled well by automated planners. On the other hand, the remaining problem involves finding node-disjoint sequences with state-dependent travel times on the arcs, which are highly challenging for a Mixed-Integer Program (MIP). In this paper, we address the problem of finding feasible sequences using a combined MIP and planning based decomposition approach. The MIP takes care of the resource constraints, and the planner solves the remaining sequence problem. We extend the notion of finding feasible sequences to finding good feasible sequences, by devising a heuristic objective function in the MIP, which improves the resulting search space for the planner. We empirically analyse the scalability of our approach on a benchmark data set, before demonstrating its effectiveness on a real world case study provided by our industry partner. These results demonstrate that by using a heuristic MIP, it is possible to obtain better makespan results with a suboptimal planner than by using an optimal planner with an uninformed MIP.
引用
收藏
页码:404 / 412
页数:9
相关论文
共 50 条
  • [1] Automated Planning of Underground Mining Operations with Regard to Geological and Geotechnical Constraints
    Laptev, V. V.
    Gurin, K. P.
    JOURNAL OF MINING SCIENCE, 2023, 59 (03) : 490 - 496
  • [2] Automated Planning of Underground Mining Operations with Regard to Geological and Geotechnical Constraints
    V. V. Laptev
    K. P. Gurin
    Journal of Mining Science, 2023, 59 : 490 - 496
  • [3] Capacity planning method for semiconductor fab with time constraints between operations
    Kitamura, Shoichi
    Mori, Kazuyuki
    Ono, Akira
    2006 SICE-ICASE INTERNATIONAL JOINT CONFERENCE, VOLS 1-13, 2006, : 5462 - +
  • [4] Planning under resource constraints
    Koehler, J
    ECAI 1998: 13TH EUROPEAN CONFERENCE ON ARTIFICIAL INTELLIGENCE, PROCEEDINGS, 1998, : 489 - 493
  • [5] Planning the mining operations at Kumtor mine
    Rogers, T.
    Schlesser, F.
    Chunuev, I.K.
    Gornyi Zhurnal, 2001, (10): : 105 - 112
  • [6] PLANNING MINING OPERATIONS IN REMOTE AUSTRALIA
    VENO, A
    DUFTY, NF
    PROFESSIONAL PSYCHOLOGY, 1982, 13 (05): : 722 - 727
  • [7] Mining Twitter Data with Resource Constraints
    Valkanas, George
    Katakis, Ioannis
    Gunopulos, Dimitrios
    Stefanidis, Antony
    2014 IEEE/WIC/ACM INTERNATIONAL JOINT CONFERENCES ON WEB INTELLIGENCE (WI) AND INTELLIGENT AGENT TECHNOLOGIES (IAT), VOL 1, 2014, : 157 - 164
  • [8] JOB SHOP SCHEDULING WITH UNIT TIME OPERATIONS UNDER RESOURCE CONSTRAINTS AND RELEASE DATES
    SZWARCFITER, JL
    DISCRETE APPLIED MATHEMATICS, 1987, 18 (02) : 227 - 233
  • [9] PLANNING SURFACE COAL MINING OPERATIONS WITH A MINICOMPUTER
    GIBSON, DF
    LEHMAN, TE
    COMPUTERS & INDUSTRIAL ENGINEERING, 1979, 3 (02) : 189 - 199
  • [10] MINICOMPUTER SYSTEM FOR PLANNING SURFACE MINING OPERATIONS
    GIBSON, DF
    MOONEY, E
    SATTORIVA, GA
    INDUSTRIAL ENGINEERING, 1977, 9 (12): : 62 - 63