Resource-constrained scheduling of partitioned algorithms on processor arrays

被引:11
|
作者
Dion, M [1 ]
Risset, T [1 ]
Robert, Y [1 ]
机构
[1] ECOLE NORMALE SUPER LYON,CNRS,URA 1398,LAB LIP,F-69364 LYON 07,FRANCE
关键词
D O I
10.1016/0167-9260(95)00022-4
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
We deal with the problem of partitioning and mapping uniform loop nests onto physical processor arrays. Resource constraints are taken into account: not only do we assume a limited number of available processors, but we also assume that the communication capabilities of the physical processors are restricted (in particular, the number of communication links in each direction is bounded). This paper is motivated by the recent work of Chou and Kung and of Thiele. Our main contributions are a new formulation of the complex optimization problem to be solved in terms of a single integer linear programming problem, as well as optimal scheduling algorithms and complexity results in the case of Linear processor arrays.
引用
收藏
页码:139 / 159
页数:21
相关论文
共 50 条
  • [31] Resource-Constrained Scheduling Algorithms for Stochastic Independent Tasks With Unknown Probability Distribution
    Gao, Yiqin
    Robert, Yves
    Vivien, Frederic
    ALGORITHMICA, 2023, 85 (08) : 2363 - 2394
  • [32] NEW PSEUDO POLYNOMIAL ALGORITHMS FOR A PARTIAL RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
    Wei, Hanying
    Su, Zhixiong
    Qi, Jianxun
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2023, 19 (11) : 8271 - 8298
  • [33] AN ITERATIVE SCHEDULING TECHNIQUE FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING
    LI, KY
    WILLIS, RJ
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 56 (03) : 370 - 379
  • [34] NONPREEMPTIVE MULTIMODE RESOURCE-CONSTRAINED PROJECT SCHEDULING
    DREXL, A
    GRUENEWALD, J
    IIE TRANSACTIONS, 1993, 25 (05) : 74 - 81
  • [35] Disruption management for resource-constrained project scheduling
    Zhu, G
    Bard, JF
    Yu, G
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2005, 56 (04) : 365 - 381
  • [36] An Extended CPM for Resource-constrained Project Scheduling
    Ju, C. H.
    Xie, Y.
    ULTRA-PRECISION MACHINING TECHNOLOGIES, 2009, 69-70 : 695 - 699
  • [37] Resource-constrained project scheduling problem with reworking
    Liao Y.
    Lu Z.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (11): : 2762 - 2774
  • [38] A Practical Approach for Resource-Constrained Project Scheduling
    Manousakis, Konstantinos
    Savva, Giannis
    Papadouri, Nicos
    Mavrovouniotis, Michalis
    Christofides, Athanasios
    Kolokotroni, Nedi
    Ellinas, Georgios
    IEEE ACCESS, 2024, 12 : 12976 - 12991
  • [39] Resource-constrained formulation for production scheduling and maintenance
    Aguirre, Adrian M.
    Papageorgiou, Lazaros G.
    27TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, PT B, 2017, 40B : 1375 - 1380
  • [40] RESOURCE-CONSTRAINED PROJECT SCHEDULING - STATE OF ART
    HERROELEN, WS
    OPERATIONAL RESEARCH QUARTERLY, 1972, 23 (03) : 261 - +