Fighting Corruption in Public Works: The Use of Cost Engineering in Criminal Investigation

被引:2
|
作者
Lopes, Alan de Oliveira [1 ]
Andrade, Michelle [2 ]
机构
[1] Brazilian Fed Police, Natl Inst Criminalist, Forens Engn Serv, Fed Criminal Expert, Spo Quadra 7,Lote 23,Estr St Policial Militar Asa, BR-70610200 Brasilia, DF, Brazil
[2] Univ Brasilia UnB Asa Norte, Grad Program Transportat, BR-70910900 Brasilia, DF, Brazil
关键词
Public works; Overbilling; Corruption; Government procurement; ACCOUNTABILITY; PROCUREMENT; OVERRUNS;
D O I
10.1061/(ASCE)LA.1943-4170.0000548
中图分类号
D9 [法律]; DF [法律];
学科分类号
0301 ;
摘要
Cost engineering aims to obtain reliable cost and schedule estimates. However, many public works demand additional costs that are considerably higher than the initial cost estimates. In Brazil, this can be partially explained by how the government hires public works services. Because of the high frequency of this problem and the associated damage, the aspects that impact overpricing should be better understood, including fraudulent acts. This paper presents a case study to demonstrate how cost engineering can be used to identify frauds in Brazilian public works. The research method was based on a quantitative approach to describe the estimated overbilling through bibliographic and documentary analysis of forensics engineering expert reports. Data from public works contracts were obtained for a 4-year period, which resulted in an average percentage of overbilling. This index enabled identifying fraudulent evidence in Brazilian public works that match a period of highly corrupt practices in the country. (C) 2022 American Society of Civil Engineers.