Planning India's long-term energy shipment infrastructures for electricity and coal

被引:4
|
作者
Bowen, Brian H. [1 ]
Canchi, Devendra [1 ]
Lalit, Vishal Agarwal [1 ]
Preckel, Paul V. [1 ]
Sparrow, F. T. [1 ]
Irwin, Marty W. [1 ]
机构
[1] Purdue Univ, Energy Ctr Discovery Pk, W Lafayette, IN 47907 USA
关键词
India power grid; Electricity system planning; Coal policy;
D O I
10.1016/j.enpol.2009.09.033
中图分类号
F [经济];
学科分类号
02 ;
摘要
The Purdue Long-Term Electricity Trading and Capacity Expansion Planning Model simultaneously optimizes both transmission and generation capacity expansions. Most commercial electricity system planning software is limited to only transmission planning. An application of the model to India's national power grid, for 2008-2028, indicates substantial transmission expansion is the cost-effective means of meeting the needs of the nation's growing economy. An electricity demand growth rate of 4% over the 20-year planning horizon requires more than a 50% increase in the Government's forecasted transmission capacity expansion, and 8% demand growth requires more than a six-fold increase in the planned transmission capacity expansion. The model minimizes the long-term expansion costs (operational and capital) for the nation's five existing regional power grids and suggests the need for large increases in load-carrying capability between them. Changes in coal policy affect both the location of new thermal power plants and the optimal pattern inter-regional transmission expansions. (C) 2009 Elsevier Ltd. All rights reserved.
引用
收藏
页码:432 / 444
页数:13
相关论文
共 50 条
  • [31] Pedestrian Trajectory Prediction in Large Infrastructures A Long-term Approach based on Path Planning
    Garzon, Mario
    Garzon-Ramos, David
    Barrientos, Antonio
    del Cerro, Jaime
    ICINCO: PROCEEDINGS OF THE 13TH INTERNATIONAL CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION AND ROBOTICS, VOL 2, 2016, : 381 - 389
  • [32] Long-term electricity sector expansion planning: A unique opportunity for a least cost energy transition in South Africa
    Wright, J. G.
    Bischof-Niemz, T.
    Calitz, J. R.
    Mushwana, C.
    van Heerden, R.
    RENEWABLE ENERGY FOCUS, 2019, 30 : 21 - 45
  • [33] Integrated Resource Planning for Long-term Electricity Supply in Selected GMS Countries, Part 1:Energy Efficiency and Renewable Energy
    Pagnarith, K.
    Limmeechokchai, B.
    ENERGY SOURCES PART B-ECONOMICS PLANNING AND POLICY, 2015, 10 (02) : 167 - 175
  • [34] MID-TERM AND LONG-TERM ENERGY PLANNING - ANTICIPATIONS OR PREDICTIONS
    MAILLARD, D
    REVUE GENERALE DE THERMIQUE, 1983, 22 (258-): : 521 - 531
  • [35] Long-term planning
    Simpson, Anthony
    OPERA, 2010, 61 (09): : 1079 - 1079
  • [36] Long-term planning
    Park, Julia
    Building Engineer, 2021, 96 (02): : 24 - 25
  • [37] INTEGRATED ENERGY-MODEL AND THE PLANNING FOR LONG-RUN SUPPLY OF ELECTRICITY IN INDIA
    SENGUPTA, R
    SANKHYA-THE INDIAN JOURNAL OF STATISTICS SERIES B, 1992, 54 : 370 - 408
  • [38] Optimal Micro-siting Planning Considering Long-Term Electricity Demand
    Yin, Peng-Yeng
    Chao, Ching-Hui
    Wu, Tsai-Hung
    Hsu, Ping-Yi
    ADVANCES IN SWARM INTELLIGENCE, ICSI 2017, PT II, 2017, 10386 : 445 - 453
  • [39] Reference data for long-term monitoring of infrastructures
    Anderegg, Peter
    Broennimann, Rolf
    Meier, Urs
    BAUTECHNIK, 2018, 95 (07) : 494 - 498
  • [40] Institutional repositories as infrastructures for long-term preservation
    Francke, Helena
    Gamalielsson, Jonas
    Lundell, Bjorn
    INFORMATION RESEARCH-AN INTERNATIONAL ELECTRONIC JOURNAL, 2017, 22 (02):