Risk Assessment of Six Indicators in Power System Operation

被引:0
|
作者
Yan, Jingdong [1 ]
Ji, Yang [1 ]
机构
[1] Wuhan Univ Technol, Sch Management, Wuhan, Peoples R China
关键词
Power system; Operational Risk; Risk index; Risk assessment;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Based on the theory and methods of power system, this paper combines five kinds of state characteristics of the power system operation and researches hierarchical network model which is suitable to the probabilistic risk assessment. More, with the lack of risk indicators of traditional power system in the operation of risk assessment, giving six reliable indicators including line overload, transformer overload, low voltage, voltage instability of power systems, lost load, cascading failures. In order to improve the accuracy of the operation of risk assessment, this paper proposes risk assessment method use with combination of state-space approach and analytic hierarchy process.
引用
收藏
页数:4
相关论文
共 50 条
  • [21] Safety Operation Analysis of West Six Eparchies in Yunnan Power System
    Sun, S. Y.
    Shu, H. C.
    Zhang, D.
    Li, L. F.
    Wu, C.
    Zhang, J.
    Cheng, M.
    Zhao, B.
    [J]. 2008 IEEE ELECTRICAL POWER AND ENERGY CONFERENCE, 2008, : 472 - +
  • [22] Imprecise Risk Assessment of Power System
    Qi, Xianjun
    Peng, Xiangtian
    Huang, Xiangyu
    [J]. POWER AND ENERGY SYSTEMS III, 2014, 492 : 526 - 530
  • [23] Review on Risk Assessment of Power System
    Yu Shiwen
    Hou Hui
    Wang Chengzhi
    Geng Hao
    Fan Hao
    [J]. 8TH INTERNATIONAL CONFERENCE ON AMBIENT SYSTEMS, NETWORKS AND TECHNOLOGIES (ANT-2017) AND THE 7TH INTERNATIONAL CONFERENCE ON SUSTAINABLE ENERGY INFORMATION TECHNOLOGY (SEIT 2017), 2017, 109 : 1200 - 1205
  • [24] Algorithmic approaches to reducing risk in power system operation
    Phillips, Laurence R.
    [J]. 2007 1ST ANNUAL IEEE SYSTEMS CONFERENCE, 2007, : 314 - 320
  • [25] Risk assessment, management and application in nuclear power plant operation
    Sheng, Guo-Long
    Qiu, Yan-Rong
    Li, Qiong-Zhe
    [J]. Journal of Donghua University (English Edition), 2014, 31 (06) : 895 - 898
  • [26] Risk Assessment,Management and Application in Nuclear Power Plant Operation
    圣国龙
    邱艳荣
    李琼哲
    [J]. Journal of Donghua University(English Edition), 2014, 31 (06) : 895 - 898
  • [27] Quantified risk assessment in railway system design and operation
    Haile, JP
    [J]. QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 1995, 11 (06) : 439 - 443
  • [28] Assessing System Risk and Integrating Operation and Planning Functions for Chongqing Power using EPRI Probabilistic Risk Assessment Program
    Zhang, Pei
    Liu, Shanshan
    Xu, Ruilin
    Liu, Xinyu
    Feng, Li
    [J]. 2010 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2010,
  • [29] Risk Indicators of Water Network Operation
    Studzinski, Andrzej
    Pietrucha-Urbanik, Katarzyna
    [J]. CISAP5: INTERNATIONAL CONFERENCE ON SAFETY & ENVIRONMENT IN PROCESS & POWER INDUSTRY, PT 1, 2012, 26 : 189 - 194
  • [30] Assessment of the rise in the turbine operation risk due to increased cyclicity of the power unit operation
    Rusin, Andrzej
    Bieniek, Michal
    Lipka, Marian
    [J]. ENERGY, 2016, 96 : 394 - 403