摘要
Over the last few years quantified risk assessment (QRA), a technique developed in the process industries, has moved into the railway and mass transport arenas. Many quantified risk assessments are now appearing covering varying aspects of railway operation and design. This paper highlights the strengths and weaknesses of the QRA technique, with specific reference to its use in railway system design and operation. Suggestions are made as to how best to manage and present a QRA, and these are illustrated in a section explaining the systematic approach of CrossRail, a joint London Underground/British Rail/Railtrack pound 2 billion railway for London. Throughout this paper it is stressed that good QRA comes from management of the process and not of the 'final figure'. The paper concludes with a listing of recommendations that are considered to be the minimum needed for the future progress of railway QRAs. Consequently the paper will be of special interest to those railway organizations undertaking or managing a QRA for the first time. Special reference is made to the use of QRAs in the presentation of Railway Safety Cases and project design.
引用
下载
收藏
页码:439 / 443
页数:5
相关论文
共 50 条
  • [1] Design and operation assessment of railway stations using passenger simulation
    Li, D.
    Han, B.
    COMPUTERS IN RAILWAYS XII: COMPUTER SYSTEM DESIGN AND OPERATION IN RAILWAYS AND OTHER TRANSIT SYSTEMS, 2010, 114 : 257 - 269
  • [2] Development of risk assessment method for railway system
    Horiuchi, Masahiko
    Japanese Railway Engineering, 1999, (141): : 9 - 11
  • [3] RISK ASSESSMENT OF THE SPANISH NATIONAL RAILWAY SYSTEM
    Mateos, A.
    Jimenez, A.
    Pichardo, H. J.
    UNCERTAINTY MODELING IN KNOWLEDGE ENGINEERING AND DECISION MAKING, 2012, 7 : 1099 - 1104
  • [4] Quantified risk assessment - Preface
    Papazoglou, IA
    JOURNAL OF HAZARDOUS MATERIALS, 2000, 71 (1-3) : IX - XIII
  • [5] Review of Railway Operation Tunnel Inspection System and Condition Assessment Method
    Song, Guohua
    Huang, Yan
    Wang, Zhaoning
    Feng, Qiankuan
    Jia, Feiyu
    Wang, Shilei
    ACTA POLYTECHNICA HUNGARICA, 2024, 21 (01) : 259 - 279
  • [6] Risk Assessment on Subsea Tunnel Operation System
    Zhang Sulei
    Feng Quanzhang
    Dong Xiaoming
    Zhang Dingli
    Chen Fengbin
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL. VIII, PTS A AND B, 2010, 8 : 257 - 261
  • [7] Errors and their control for quantified risk assessment
    Tiemin, L
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL 4, PTS A and B, 2004, 4 : 1749 - 1752
  • [8] Quantified risk assessment in hydropower plants
    Eriksson, M
    Lindberg, JE
    SAFETY AND RELIABILITY, VOLS 1 & 2, 1999, : 1339 - 1342
  • [9] Risk Assessment and Early-Warning System for High-Speed Railway during the Construction and Operation of Underpass Bridges
    He, Wei
    Duan, Yinlong
    Deng, Liwen
    Zhou, Weiguang
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2016, 30 (01)
  • [10] Design of operation assessment system based on expert system of dispatch operation sheet in substation
    Zhang, Wen-Kai
    Zhang, Dong-Ying
    Xu, Shan
    Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2009, 37 (09): : 78 - 81