Quantified risk assessment in railway system design and operation

被引:5
|
作者
Haile, JP
机构
[1] British Rail Safety Directorate, London, NW1 1DZ
关键词
risk assessment; safety; QRA; railways;
D O I
10.1002/qre.4680110608
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Over the last few years quantified risk assessment (QRA), a technique developed in the process industries, has moved into the railway and mass transport arenas. Many quantified risk assessments are now appearing covering varying aspects of railway operation and design. This paper highlights the strengths and weaknesses of the QRA technique, with specific reference to its use in railway system design and operation. Suggestions are made as to how best to manage and present a QRA, and these are illustrated in a section explaining the systematic approach of CrossRail, a joint London Underground/British Rail/Railtrack pound 2 billion railway for London. Throughout this paper it is stressed that good QRA comes from management of the process and not of the 'final figure'. The paper concludes with a listing of recommendations that are considered to be the minimum needed for the future progress of railway QRAs. Consequently the paper will be of special interest to those railway organizations undertaking or managing a QRA for the first time. Special reference is made to the use of QRAs in the presentation of Railway Safety Cases and project design.
引用
下载
收藏
页码:439 / 443
页数:5
相关论文
共 50 条
  • [41] Management tool for undertaking quantified risk assessment studies
    Filippin, Katherine
    Jarman, Mark
    Ammonia Plant Safety (and Related Facilities), 39 : 307 - 318
  • [42] Management tool for undertaking quantified risk assessment studies
    Filippin, K
    Jarman, M
    AMMONIA PLANT SAFETY & RELATED FACILITIES, VOL 39, 1999, 39 : 307 - 318
  • [43] Earthworks risk assessment on a heritage railway
    Crapper, Martin
    Fell, Michael
    Gammoh, Imad
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GEOTECHNICAL ENGINEERING, 2014, 167 (04) : 344 - 356
  • [44] Railway bridge risk assessment in Finland
    Wuorenjuuri, J.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, RESILIENCE AND SUSTAINABILITY, 2012, : 597 - 600
  • [45] A quantitative assessment on the design of a railway station
    Daamen, W
    COMPUTERS IN RAILWAYS VIII, 2002, 13 : 191 - 200
  • [46] Top level risk study - A cost effective quantified risk assessment
    Facer, RI
    Ashurst, JAS
    Lee, KA
    HAZARDS XIV: COST EFFECTIVE SAFETY, 1998, (144): : 447 - 459
  • [47] RISK MANAGEMENT IN THE OPERATION AND MAINTENANCE OF RAILWAY FREIGHT WAGONS
    Grencik, Juraj
    Gallikova, Jana
    Volna, Peter
    XXIV. MEDZINARODNA KONFERENCIA SUCASNE PROBLEMY V KOLAJAVYCH VOZIDLACH, DIEL I, 2019, : 161 - 170
  • [48] Assessment of design parameters of a slab track railway system from a dynamic viewpoint
    Steenbergen, M. J. M. M.
    Metrikine, A. V.
    Esveld, C.
    JOURNAL OF SOUND AND VIBRATION, 2007, 306 (1-2) : 361 - 371
  • [49] Risk assessment on railway signal system based on Fuzzy-FMECA method
    You-Peng, Zhang
    Zheng-Jie, Xu
    Hong-Sheng, Su
    Sensors and Transducers, 2013, 156 (09): : 203 - 210
  • [50] Design and realization of urban railway transportation train operation control simulation system based on RUP
    Wang, Xi
    Tang, Tao
    Xitong Fangzhen Xuebao / Journal of System Simulation, 2008, 20 (15): : 4012 - 4017