On effective rapid startup of 300 MW steam turbine unit

被引:0
|
作者
Dong, Chao [1 ]
Wang, Bin [2 ]
Sun, Yongjian [1 ]
Wang, Xiaohong [1 ]
机构
[1] Univ Jinan, Sch Elect Engn, Jinan, Shandong, Peoples R China
[2] Jinan Publ Secur Bur, Special Police Detachment Training Off, Jinan, Shandong, Peoples R China
关键词
300MW Steam Turbine; rotor; Temperature rise rate; Effective stress; Start-up optimization; OPTIMIZATION; PERFORMANCE;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, a 300MW steam turbine unit is taken as the research object. After analyzing the starting process of the steam turbine unit under the original working condition, a fast optimization method of temperature rise rate is proposed. Firstly, a nonlinear mathematical model with constraint conditions is established for the start-up conditions of the steam turbine unit. Then, through the analysis of the start-up conditions under the original working conditions, the thermal stress value of the rotor under the original working conditions is analyzed, the curve of the thermal stress value is fitted, the initial value of the optimization method of the temperature rise rate is determined, and the optimization method of temperature rise rate designed in this paper is used to calculate the temperature rise rate, and two are finally determined. The most reasonable temperature rise rate optimization scheme is selected by considering the value of shortening time and effective stress. The final optimization scheme of temperature rise rate in this paper reduces the total start-up time by 55 minutes and the start-up efficiency is nearly 9.2%, which greatly improves the efficiency and economy of the start-up process.
引用
收藏
页码:803 / 808
页数:6
相关论文
共 50 条
  • [31] INFORMATION SYSTEM FOR CONTROL OF A 200 MW UNIT-TYPE STEAM TURBINE-GAS TURBINE PLANT
    SHORNIKOV, EA
    TINKER, EM
    SOSINOVICH, VA
    [J]. THERMAL ENGINEERING, 1969, 16 (11) : 29 - +
  • [32] Experimental investigation of the steam wetness in a 1000 MW steam turbine
    Kolovratnik, Michal
    Bartos, Ondrej
    [J]. EFM15 - EXPERIMENTAL FLUID MECHANICS 2015, 2016, 114
  • [33] Life management of 300 MW/600 MW fossil turbine
    Zhang, Da-Ji
    Wang, Li-Hai
    Guan, Wei-Shi
    Xu, Yi-Nan
    [J]. Qilunji Jishu/Turbine Technology, 2001, 43 (06):
  • [34] Numerical Analysis of Fatigue Life Improvement by Optimizing the Startup Phase for a 1000 MW Supercritical Steam Turbine Inner Casing
    Wang, Weizhe
    [J]. JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 2015, 137 (04):
  • [35] Wet steam wetness measurement in a 10 MW steam turbine
    Kolovratnik, Michal
    Bartos, Ondrej
    [J]. EFM13 - EXPERIMENTAL FLUID MECHANICS 2013, 2014, 67
  • [36] STEAM WHIRL DETECTION AND CORRECTION IN 135 MW STEAM TURBINE
    Chumai, Roengchai
    Lertsongkram, Pisut
    Koondilogpiboon, Nuntaphong
    [J]. PROCEEDINGS OF ASME TURBO EXPO 2024: TURBOMACHINERY TECHNICAL CONFERENCE AND EXPOSITION, GT2024, VOL 9, 2024,
  • [37] INVESTIGATION OF STRESSES IN 255 AT A STEAM LINES OF A 300 MW UNIT UNDER VARIABLE OPERATIONAL CONDITIONS
    ELIZAROV, DP
    KORZUN, II
    PILLER, FI
    [J]. THERMAL ENGINEERING, 1969, 16 (04) : 19 - &
  • [38] Energy loss detection system of a 300 MW steam turbine set based on C/S structure
    Hu, Nian-Su
    Guo, Qiang
    Shen, Li
    Fan, Tian-Jing
    [J]. Dongli Gongcheng/Power Engineering, 2002, 22 (04):
  • [39] Cause analysis of cracking damage on the second last stage blades of one 300 MW steam turbine
    Liu, Zhijiang
    Yuan, Ping
    Cai, Lidong
    [J]. Zhongguo Dianli/Electric Power, 2000, 33 (06): : 7 - 10
  • [40] IP Start-up Control for 300MW Turbine Unit with Bypass System
    Wang, Weibing
    Wang, Xudong
    Liu, Dongju
    [J]. INTERNATIONAL WORKSHOP ON AUTOMOBILE, POWER AND ENERGY ENGINEERING, 2011, 16