Case study: Implementation of the IEC61508 standard on a chemical plant upgrade project

被引:0
|
作者
Beale, CJ [1 ]
Dunford, S [1 ]
机构
[1] Ciba Specialty Chem, Addit Div, Bradford BD12 OJZ, W Yorkshire, England
关键词
IEC61508; risk assessment; plant automation;
D O I
暂无
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Many chemical plants now rely on automated control and protection systems. Great care must be taken when designing, operating and maintaining these systems to ensure that potential common mode failures are minimised and system reliability is optimised. The new international standard IEC61508 provides a framework for systematically managing the risks associated with these automated systems. In many ways, the standard is a framework which binds existing safety and risk engineering techniques together rather than being a completely new technique. Emphasis is placed on using systematic approaches, compiling comprehensive documentation, making use of multi-disciplinary teams and taking a Lifecycle approach for the project. The IEC61508 standard has been used successfully on several recent projects at the Bradford site which have major accident hazard potential. This paper explains how the standard has been applied to real projects and highlights the areas of the standard which were difficult to implement.
引用
收藏
页码:563 / 580
页数:18
相关论文
共 50 条
  • [31] Impact of plant upgrade and DMS on the processing capability of the Tati Nickel concentrator - A case study
    DRA Mineral Projects Ltd., Johannesburg, South Africa
    SIAMM J S Afr Inst Min Metall, 2009, 11 (647-652):
  • [32] Clientelism at work? A case study of Kenyan Standard Gauge Railway project
    Wang, Yuan
    Wissenbach, Uwe
    ECONOMIC HISTORY OF DEVELOPING REGIONS, 2019, 34 (03) : 280 - 299
  • [33] Optimization of chemical plant layout and pilot study on implementation of Industry 4.0
    Raj, S. Aravind
    Zubar, H. Abdul
    Basahel, Abdulrahman M.
    JOURNAL OF MECHANICS OF CONTINUA AND MATHEMATICAL SCIENCES, 2019, : 68 - 81
  • [34] Configuration of project steering committees and their role in project implementation insights from case study data
    Lechler, Thomas G.
    Cohen, Martin
    PICMET '07: PORTLAND INTERNATIONAL CENTER FOR MANAGEMENT OF ENGINEERING AND TECHNOLOGY, VOLS 1-6, PROCEEDINGS: MANAGEMENT OF CONVERGING TECHNOLOGIES, 2007, : 2198 - 2204
  • [35] Integrated project management information systems in construction: A case study implementation
    Stephenson, P
    Scrimshaw, IC
    SYSTEM-BASED VISION FOR STRATEGIC AND CREATIVE DESIGN, VOLS 1-3, 2003, : 2245 - 2250
  • [36] Students' Perceptions on the Implementation of the Final Year Research Project: A Case Study
    Din, Ummul Khair Salma
    Shahabuddin, Faridatulazna Ahmad
    Rambely, Azmin Sham
    Suradi, Nur Riza Mohd
    Ahmad, Rokiah Rozita
    Majid, Noriza
    Ali, Zalina Mohd
    Mamat, Nur Jumaadzan Zaleha
    INTERNATIONAL CONFERENCE ON MATHEMATICS EDUCATION RESEARCH 2010 - ICMER 2010, 2010, 8 : 439 - 445
  • [37] Beyond factors that motivate the adoption of the ISO/IEC 29110 in Mexico: An exploratory study of the implementation pace of this standard and the benefits observed
    Munoz, Mirna
    Mejia, Jezreel
    Pena, Adriana
    Laporte, Claude Y.
    Piedad Gasca-Hurtado, Gloria
    IET SOFTWARE, 2021, 15 (06) : 412 - 427
  • [38] Alignment at the top: A case study investigating this critical factor in project implementation
    Hacker, Maria
    Doolen, Toni
    EMJ-ENGINEERING MANAGEMENT JOURNAL, 2007, 19 (01): : 38 - 42
  • [39] DEVELOPMENT AND IMPLEMENTATION OF AN AGRICULTURAL LOAD MANAGEMENT PROJECT - A CASE-STUDY
    LEBLANC, WJ
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1988, 3 (04) : 1793 - 1797
  • [40] Interoperability based on IEC 61850 standard: Systematic literature review, certification method proposal, and case study
    Ayello, Matheus
    Lopes, Yona
    ELECTRIC POWER SYSTEMS RESEARCH, 2023, 220