Case study: Implementation of the IEC61508 standard on a chemical plant upgrade project

被引:0
|
作者
Beale, CJ [1 ]
Dunford, S [1 ]
机构
[1] Ciba Specialty Chem, Addit Div, Bradford BD12 OJZ, W Yorkshire, England
关键词
IEC61508; risk assessment; plant automation;
D O I
暂无
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Many chemical plants now rely on automated control and protection systems. Great care must be taken when designing, operating and maintaining these systems to ensure that potential common mode failures are minimised and system reliability is optimised. The new international standard IEC61508 provides a framework for systematically managing the risks associated with these automated systems. In many ways, the standard is a framework which binds existing safety and risk engineering techniques together rather than being a completely new technique. Emphasis is placed on using systematic approaches, compiling comprehensive documentation, making use of multi-disciplinary teams and taking a Lifecycle approach for the project. The IEC61508 standard has been used successfully on several recent projects at the Bradford site which have major accident hazard potential. This paper explains how the standard has been applied to real projects and highlights the areas of the standard which were difficult to implement.
引用
收藏
页码:563 / 580
页数:18
相关论文
共 50 条
  • [21] Power System Protection Upgrade at Anclote Plant - A Case Study in Florida State
    Asrari, Arash
    Ramos, Benito
    2018 IEEE TEXAS POWER AND ENERGY CONFERENCE (TPEC), 2018,
  • [22] Hybrid SCL and handmined shaft - A case study from the bank station upgrade project
    Nasekhian, Ali
    Ng, Zhen
    Savage, Garry
    Macknight, Stuart
    PROCEEDINGS OF THE ITA-AITES WORLD TUNNEL CONGRESS 2023, WTC 2023: Expanding Underground-Knowledge and Passion to Make a Positive Impact on the World, 2023, : 2130 - 2137
  • [23] Kanban implementation at a tyre manufacturing plant: a case study
    Mukhopadhyay, SK
    Shanker, S
    PRODUCTION PLANNING & CONTROL, 2005, 16 (05) : 488 - 499
  • [24] PRELIMINARY ANALYSIS OF THE DEVELOPMENT AND IMPLEMENTATION OF THE MOOC PROJECT: A CASE STUDY
    Smyrnova-Trybulska, Eugenia
    Sekret, Iryna
    Morze, Nataliia
    E-LEARNING IN THE TIME OF COVID-19, 2021, 13 : 137 - 150
  • [25] IMPLEMENTATION OF PROJECT OFFICES IN INSTITUTION OF HIGHER EDUCATION: A CASE STUDY
    Vimercati, Eduardo
    Patah, Leandro Alves
    REVISTA DE GESTAO E SECRETARIADO-GESEC, 2016, 7 (01): : 85 - 111
  • [26] Success Factor for IT Project Implementation in Banking Industry: A Case Study
    Priambodo, Apiladosi
    Handayani, Putu Wuri
    Pinem, Ave Adriana
    2019 3RD INTERNATIONAL CONFERENCE ON INFORMATICS AND COMPUTATIONAL SCIENCES (ICICOS 2019), 2019,
  • [27] Organizational Structure in IT Governance: A Case Study of an IT Governance Implementation Project
    Larsson, Fredrik
    Rusu, Lazar
    Aasi, Parisa
    AMCIS 2015 PROCEEDINGS, 2015,
  • [28] LEARNING BY GAMES; A STUDY CASE OF THE COFFE PROJECT IMPLEMENTATION IN ROMANIA
    Mocofan, Muguras
    ELEARNING VISION 2020!, VOL I, 2016, : 529 - 533
  • [29] COOPETITION AND ENGAGEMENT TO THE IMPLEMENTATION OF PROJECT TASKS: CASE STUDY IN DIDACTIC
    Moczulska, Marta
    Winkler, Renata
    12TH INTERNATIONAL CONFERENCE OF EDUCATION, RESEARCH AND INNOVATION (ICERI2019), 2019, : 6806 - 6814
  • [30] Project portfolio management in a company strategy implementation, a case study
    Hyvari, Irja
    SELECTED PAPERS FROM THE 27TH IPMA (INTERNATIONAL PROJECT MANAGEMENT ASSOCIATION), 2014, 119 : 229 - 236