Problem space search algorithms for resource-constrained project scheduling

被引:30
|
作者
Naphade, KS [1 ]
Wu, SD [1 ]
Storer, RH [1 ]
机构
[1] LEHIGH UNIV,DEPT IND & MFG SYST ENGN,BETHLEHEM,PA 18015
关键词
Problem Space; Project Schedule; Average Computational Time; Base Heuristic; Resource Constrain Project Schedule Problem;
D O I
10.1023/A:1018982423325
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
The Resource-Constrained Project Scheduling (RCPS) problem is a well known and challenging combinatorial optimization problem. It is a generalization of the Job Shop Scheduling problem and thus is NP-hard in the strong sense. Problem Space Search is a local search ''metaheuristic'' which has been shown to be effective for a variety of combinatorial optimization problems including Job Shop Scheduling. In this paper, we propose two problem space search heuristics for the RCPS problem. These heuristics are tested through intensive computational experiments on a 480-instance RCPS data set recently generated by Kolisch et al. [12]. Using this data set we compare our heuristics with a branch-and-bound algorithm developed by Demuelemeester and Herreolen [9]. The results produced by the heuristics are extremely encouraging, showing comparable performance to the branch-and-bound algorithm.
引用
收藏
页码:307 / 326
页数:20
相关论文
共 50 条
  • [31] Genetic algorithm for the resource-constrained project scheduling problem
    E. N. Goncharov
    V. V. Leonov
    [J]. Automation and Remote Control, 2017, 78 : 1101 - 1114
  • [32] A hybrid metaheuristic for the resource-constrained project scheduling problem
    Tseng, Lin-Yu
    Chen, Shih-Chieh
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 175 (02) : 707 - 721
  • [33] An evolution programme for the resource-constrained project scheduling problem
    Cheng, RW
    Gen, M
    [J]. INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1998, 11 (03) : 274 - 287
  • [34] Memetic algorithm for the resource-constrained project scheduling problem
    Chen, Di
    Liu, Shixin
    Qin, Shujin
    [J]. 2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, : 4991 - 4996
  • [35] Resource-Constrained Project Scheduling Problem with Modified PSO
    Zhang, Kai
    Jiang, Jing
    Zhao, Guo-rong
    [J]. ICMS2010: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION, VOL 6: MODELLING & SIMULATION INDUSTRIAL ENGINEERING & MANAGEMENT, 2010, : 308 - 311
  • [36] Genetic algorithm for the resource-constrained project scheduling problem
    Goncharov, E. N.
    Leonov, V. V.
    [J]. AUTOMATION AND REMOTE CONTROL, 2017, 78 (06) : 1101 - 1114
  • [37] A multiobjective resource-constrained project-scheduling problem
    Ben Abdelaziz, Fouad
    Krichen, Saoussen
    Dridi, Olfa
    [J]. SYMBOLIC AND QUANTITATIVE APPROACHES TO REASONING WITH UNCERTAINTY, PROCEEDINGS, 2007, 4724 : 719 - +
  • [38] Integration of routing into a resource-constrained project scheduling problem
    Lacomme, Philippe
    Moukrim, Aziz
    Quilliot, Alain
    Vinot, Marina
    [J]. EURO JOURNAL ON COMPUTATIONAL OPTIMIZATION, 2019, 7 (04) : 421 - 464
  • [39] Evaluation of Heuristics for a Resource-Constrained Project Scheduling Problem
    Zhong, Shisheng
    Fu, Xuyun
    Lin, Lin
    Wang, Guolei
    [J]. MACHINING AND ADVANCED MANUFACTURING TECHNOLOGY X, 2010, 431-432 : 122 - 125
  • [40] The proactive and reactive resource-constrained project scheduling problem
    Davari, Morteza
    Demeulemeester, Erik
    [J]. JOURNAL OF SCHEDULING, 2019, 22 (02) : 211 - 237