A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing

被引:16
|
作者
Van den Eeckhout, M. [1 ]
Vanhoucke, M. [1 ,2 ,3 ]
Maenhout, B. [1 ]
机构
[1] Univ Ghent, Fac Econ & Business Adm, Tweekerkenstr 2, B-9000 Ghent, Belgium
[2] Vlerick Business Sch, Technol & Operat Management Area, Ghent, Belgium
[3] UCL, UCL Sch Management, London, England
关键词
Multi-project scheduling; Personnel staffing; Column generation; Diving heuristic; Resource sharing; BRANCH-AND-PRICE; EMPLOYEE SCHEDULING PROBLEM; MATHEMATICAL-MODEL; NURSING STAFF; ALLOCATION; FLEXIBILITY; ALGORITHM; MOVEMENT; WORKERS; SHIFTS;
D O I
10.1016/j.cor.2020.105163
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Project managers are often responsible for the management of multiple projects and associated personnel budgeting decisions. In order to determine the workforce size and mix accurately, we integrate the multi project scheduling problem and personnel staffing problem. We construct a baseline personnel roster that takes the personnel scheduling constraints into account and model the workload stemming from the project activities as an endogenous variable in the model. In order to decrease the overall staffing budget, we consider the sharing of resources, i.e. personnel resources can be transferred between projects. In the problem under study, we consider unproductive resource transfer times and different restrictions related to the sharing of resources imposed on the schedule of individual workers, which is often neglected in the literature. We propose a multi-stage solution procedure that exploits the optimal linear programming solution, obtained via column generation, to find a high-quality integer solution based on a diving heuristic. In order to improve the computational performance, different speed-up mechanisms are included relying on a state space reduction. Detailed computational experiments are presented to evaluate and benchmark different alternative optimisation strategies. Managerial insights are provided which give insight in the benefits of resource sharing. ? 2020 Elsevier Ltd. All rights reserved.
引用
收藏
页数:19
相关论文
共 47 条
  • [31] A Particle Swarm Optimization Based on Priority Rule for Resource-Constrained Multi-Project Scheduling Problem
    Deng Lin-yi
    Wang Yun-long
    Lin Yan
    2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 1038 - +
  • [32] Distributed resource constrained multi-project scheduling problem with cooperative-game based negotiation mechanism
    Liu D.
    Xu Z.
    Li F.
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2019, 39 (06): : 1507 - 1516
  • [33] Research on New Methods of Multi-project Based on Entropy and Particle Swarm Optimization for Resource Leveling Problem
    Han, Wen-min
    Zhu, Bin-bin
    PROCEEDINGS OF THE 2017 2ND INTERNATIONAL SYMPOSIUM ON ADVANCES IN ELECTRICAL, ELECTRONICS AND COMPUTER ENGINEERING (ISAEECE 2017), 2017, 124 : 215 - 221
  • [34] A Column Generation Based Heuristic for the Capacitated Vehicle Routing Problem with Three-dimensional Loading Constraints
    Mahvash, Batoul
    Awasthi, Anjali
    Chauhan, Satyaveer
    IFAC PAPERSONLINE, 2015, 48 (03): : 454 - 459
  • [35] A column generation based heuristic for the capacitated vehicle routing problem with three-dimensional loading constraints
    Mahvash, Batoul
    Awasthi, Anjali
    Chauhan, Satyaveer
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (06) : 1730 - 1747
  • [36] Research on the Problem of Selection Plannings with Dynamic Multi-mode Multi-project and Multi-task Based on Resource-Constrained
    Xia Linli
    Lei Long
    PROCEEDINGS OF 8TH INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION (ICICTA 2015), 2015, : 784 - 788
  • [37] Research on multi-agent based flexibility resource constraints project scheduling problem
    Luo Ronggui
    Tao, He
    Lu, Tan
    GLOBALIZATION CHALLENGE AND MANAGEMENT TRANSFORMATION, VOLS I - III, 2007, : 1994 - 1999
  • [38] A column-generation-based algorithm for a resource-constrained project scheduling problem with a fractional shared resource
    Wang, Qiang
    Liu, Changchun
    Zheng, Li
    ENGINEERING OPTIMIZATION, 2020, 52 (05) : 798 - 816
  • [39] Proposing new clustering-based algorithms for the multi-skilled resource-constrained multi-project scheduling problem with resource leveling adjustments
    Goudarzi, Ehsan
    Esmaeeli, Hamid
    Parsa, Kia
    Asadzadeh, Shervin
    KYBERNETES, 2025, 54 (02) : 1049 - 1081
  • [40] Event Based Approaches for Solving Multi-mode Resource Constraints Project Scheduling Problem
    Chakrabortty, Ripon Kumar
    Sarker, Ruhul Amin
    Essam, Daryl L.
    COMPUTER INFORMATION SYSTEMS AND INDUSTRIAL MANAGEMENT, CISIM 2014, 2014, 8838 : 375 - 386