A continuous model for supply planning of assembly systems with stochastic component procurement times

被引:30
|
作者
Chauhan, Satyaveer S. [1 ,2 ]
Dolgui, Alexandre [3 ]
Proth, Jean-Marie [4 ]
机构
[1] Concordia Univ, John Molson Sch Business, Montreal, PQ H3G 1M8, Canada
[2] CIRRELT, Montreal, PQ, Canada
[3] Ecole Mines St Etienne, Ctr Ind Engn & Comp Sci, F-42023 St Etienne, France
[4] INRIA SAGEP, F-57420 Pouilly, France
关键词
Assembly-to-order; Random lead-times; Supply planning; Optimization; Simulated annealing; LEAD TIMES; MRP SYSTEMS; UNCERTAINTY;
D O I
10.1016/j.ijpe.2008.11.015
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper studies a customized product assembly scenario where some components cannot be stocked due to high component cost and risk. We consider the case where these key components are ordered after a demand has been registered with a promised delivery date. Component lead-times are stochastic and associated distribution function is known in advance. The objective is to determine the ordering time for each component such as to minimize the sum of expected holding and backlogging costs. An approach to solve this problem is proposed and the algorithm is tested on a randomly generated data set. (C) 2009 Elsevier B.V. All rights reserved.
引用
下载
收藏
页码:411 / 417
页数:7
相关论文
共 50 条
  • [21] A stochastic programming model for supply chain planning
    Kuettner, R.
    PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE OF DAAAM BALTIC INDUSTRIAL ENGINEERING, PTS 1 AND 2, 2008, : 333 - 338
  • [22] The value of demand forecast updates in managing component procurement for assembly systems
    Cao, James
    So, Kut C.
    IIE TRANSACTIONS, 2016, 48 (12) : 1198 - 1216
  • [23] PLANNING COMPONENT DELIVERY INTERVALS IN CONSTRAINED ASSEMBLY SYSTEMS
    MUCKSTADT, JA
    LECTURE NOTES IN ECONOMICS AND MATHEMATICAL SYSTEMS, 1986, 266 : 132 - 149
  • [24] An optimal (Q,r) policy for a multipart assembly system under stochastic part procurement lead times
    Fujiwara, O
    Sedarage, D
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 100 (03) : 550 - 556
  • [25] Resilient relief supply planning using an integrated procurement-warehousing model under supply disruption
    Aghajani, Mojtaba
    Torabi, S. Ali
    Altay, Nezih
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2023, 118
  • [26] STOCHASTIC MODEL FOR PLANNING SUPPLY CHAINS WITH SHORT LIFECYCLE PRODUCTS
    Coronado-Hernandez, Jairo R.
    Garcia-Sabater, Jose P.
    WPOM-WORKING PAPERS ON OPERATIONS MANAGEMENT, 2010, 1 (02): : 1 - 5
  • [27] A STOCHASTIC MODEL FOR PLANNING MAINTENANCE OF MULTIPART SYSTEMS
    KARASYK
    REINITZ
    ELECTRONISCHE DATENVERARBEITUNG, 1969, 11 (12): : 596 - +
  • [28] Workforce planning in mixed model assembly systems
    Lee, CY
    Vairaktarakis, GL
    OPERATIONS RESEARCH, 1997, 45 (04) : 553 - 567
  • [29] A hybrid genetic algorithm for a multilevel assembly replenishment planning problem with stochastic lead times
    Ben-Ammar, Oussama
    Castagliola, Philippe
    Dolgui, Alexandre
    Hnaien, Faicel
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 149
  • [30] Impacts of supply risks on malting barley procurement: A discrete stochastic programming model.
    Johnson, D
    DeVuyst, EA
    Nganje, W
    JOURNAL OF AGRICULTURAL AND RESOURCE ECONOMICS, 2000, 25 (02) : 731 - 731