An optimal (Q,r) policy for a multipart assembly system under stochastic part procurement lead times

被引:28
|
作者
Fujiwara, O [1 ]
Sedarage, D [1 ]
机构
[1] ASIAN INST TECHNOL,IND SYST ENGN PROGRAM,BANGKOK 10501,THAILAND
关键词
lot size; reorder point; stochastic lead time; assembly system;
D O I
10.1016/S0377-2217(96)00230-5
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider an EOQ-type model for a simple production system, where a number of parts are acquired to produce a single product and the part procurement lead times are random. Assembly is instantaneous and takes place intermittently in batches but cannot start until all the parts are available. The problem is to simultaneously determine when to order each part and what lot size to produce, namely to determine the reorder point for each part and the assembly lot size, so that the average total cost per unit time, composed of the setup cost, inventory holding costs for the parts and the assembled product, and the shortage cost for the assembled product, is minimized. We then develop a tailor-made solution method for this problem to obtain a global optimal solution by taking advantage of the structure of the problem formulation, where the nonlinear programming problem is decomposed into a family of subproblems parametrized by the average assembly delay time. Numerical experiments are then conducted for the case of two-part problems, and some interesting observations are made. (C) 1997 Elsevier Science B.V.
引用
下载
收藏
页码:550 / 556
页数:7
相关论文
共 40 条
  • [1] Coordinated Replenishment Policy for a Decentralized Assembly System Based on Supply Hub Under Stochastic Lead Times
    Yu, Jianhong
    Wan, Fengjiao
    Zhou, Qichao
    LISS 2013, 2015, : 161 - 166
  • [2] Optimal (r, Q) policy in a stochastic inventory system with limited resource under incremental quantity discount
    Tamjidzad, Shahrzad
    Mirmohammadi, S. Hamid
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 103 : 59 - 69
  • [3] (Q, s) models for inventory policy with random component procurement lead times
    Mhada, Fatima
    Malhame, Roland
    Pellerin, Robert
    Sadr, Javad
    Gharbi, Ali
    PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IEEE-IESM 2013), 2013, : 718 - 726
  • [4] Optimal MRP offsetting for assembly systems with stochastic lead times: POQ policy and service level constraint
    Louly, Mohamed-Aly
    Dolgui, Alexandre
    Al-Ahmari, Abdulrahman
    JOURNAL OF INTELLIGENT MANUFACTURING, 2012, 23 (06) : 2485 - 2495
  • [5] Optimal MRP offsetting for assembly systems with stochastic lead times: POQ policy and service level constraint
    Mohamed-Aly Louly
    Alexandre Dolgui
    Abdulrahman Al-Ahmari
    Journal of Intelligent Manufacturing, 2012, 23 : 2485 - 2495
  • [6] Optimal Supply Planning for Two-Levels Assembly System with Stochastic Lead Times and Maintenance Actions
    Guiras, Z.
    Turki, S.
    Rezg, N.
    Dolgui, A.
    2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2016, : 551 - 556
  • [7] Modeling and analysis for determining optimal suppliers under stochastic lead times
    Abginehchi, Soheil
    Farahani, Reza Zanjirani
    APPLIED MATHEMATICAL MODELLING, 2010, 34 (05) : 1311 - 1328
  • [8] On the (Q, r) policy for perishables with positive lead times and multiple outstanding orders
    Berk, Emre
    Gurler, Ulku
    Poormoaied, Saeed
    ANNALS OF OPERATIONS RESEARCH, 2020, 284 (01) : 81 - 98
  • [9] Exact analysis and simulation test of continuous (s, Q) inventory policy with stochastic lead times
    Jie, Wan
    Li, Li
    Cheng Jingwu
    2007 INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT, VOLS 1-3, 2007, : 283 - +
  • [10] The detailed coordination problem in a two-level assembly system with stochastic lead times
    Tang, O
    Grubbström, RW
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2003, 81-2 : 415 - 429