The detailed coordination problem in a two-level assembly system with stochastic lead times

被引:35
|
作者
Tang, O [1 ]
Grubbström, RW [1 ]
机构
[1] Linkoping Inst Technol, Dept Prod Econ, S-58183 Linkoping, Sweden
关键词
production-inventory system; stochastic lead times; assembly system; safety lead time; material requirements planning;
D O I
10.1016/S0925-5273(02)00296-7
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we study the detailed coordination problem in a two-level assembly system with stochastic lead times for lower-level items and constant and deterministic demand for the finished item. General formulae are developed for solving the optimal planned lead times with the objective to minimise total stockout and inventory holding costs. Consequently, we obtain the optimal safety lead time, which is the difference between planned and expected lead time. A solution procedure for the optimal planned lead times is discussed. Numerical examples are then given to illustrate the model. Moreover, the influence of the mean value and variance of actual lead times on the system performance and optimal control variables (such as the total cost of the system and planned lead times) is studied using our numerical results. (C) 2002 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:415 / 429
页数:15
相关论文
共 50 条
  • [1] Optimal order release dates for two-level assembly systems with stochastic lead times at each level
    Ben-Ammar, Oussama
    Dolgui, Alexandre
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (12) : 4226 - 4242
  • [2] Multi-objective supply planning for two-level assembly systems with stochastic lead times
    Sakiani, R.
    Ghomi, S. M. T. Fatemi
    Zandieh, M.
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (07) : 1325 - 1332
  • [3] Genetic algorithm for supply planning in two-level assembly systems with random lead times
    Hnaien, Faicel
    Delorme, Xavier
    Dolgui, Alexandre
    [J]. ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2009, 22 (06) : 906 - 915
  • [4] A two-level distribution inventory system with stochastic lead time at the lower echelon
    A. Thangam
    R. Uthayakumar
    [J]. The International Journal of Advanced Manufacturing Technology, 2009, 41 : 1208 - 1220
  • [5] A two-level distribution inventory system with stochastic lead time at the lower echelon
    Thangam, A.
    Uthayakumar, R.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 41 (11-12): : 1208 - 1220
  • [6] A hybrid multi-objective genetic algorithm for planning order release date in two-level assembly system with random lead times
    Fallah-Jamshidi, S.
    Karimi, N.
    Zandieh, M.
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (11) : 13549 - 13554
  • [7] On the Measurement Problem for a Two-level Quantum System
    Alexey A. Kryukov
    [J]. Foundations of Physics, 2007, 37 : 3 - 39
  • [8] On the measurement problem for a two-level quantum system
    A. Kryukov, Alexey
    [J]. FOUNDATIONS OF PHYSICS, 2007, 37 (01) : 3 - 39
  • [9] A Stochastic Model for a Two-Level Disassembly Lot-Sizing Problem Under Random Lead Time
    Slama, Ilhem
    Ben-Ammar, Oussama
    Dolgui, Alexandre
    Masmoudi, Faouzi
    [J]. ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: THE PATH TO DIGITAL TRANSFORMATION AND INNOVATION OF PRODUCTION MANAGEMENT SYSTEMS, PT I, 2020, 591 : 275 - 283
  • [10] Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times
    Hnaien, Faicel
    Delorme, Xavier
    Dolgui, Alexandre
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (11) : 1835 - 1843