A continuous model for supply planning of assembly systems with stochastic component procurement times

被引:30
|
作者
Chauhan, Satyaveer S. [1 ,2 ]
Dolgui, Alexandre [3 ]
Proth, Jean-Marie [4 ]
机构
[1] Concordia Univ, John Molson Sch Business, Montreal, PQ H3G 1M8, Canada
[2] CIRRELT, Montreal, PQ, Canada
[3] Ecole Mines St Etienne, Ctr Ind Engn & Comp Sci, F-42023 St Etienne, France
[4] INRIA SAGEP, F-57420 Pouilly, France
关键词
Assembly-to-order; Random lead-times; Supply planning; Optimization; Simulated annealing; LEAD TIMES; MRP SYSTEMS; UNCERTAINTY;
D O I
10.1016/j.ijpe.2008.11.015
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper studies a customized product assembly scenario where some components cannot be stocked due to high component cost and risk. We consider the case where these key components are ordered after a demand has been registered with a promised delivery date. Component lead-times are stochastic and associated distribution function is known in advance. The objective is to determine the ordering time for each component such as to minimize the sum of expected holding and backlogging costs. An approach to solve this problem is proposed and the algorithm is tested on a randomly generated data set. (C) 2009 Elsevier B.V. All rights reserved.
引用
收藏
页码:411 / 417
页数:7
相关论文
共 50 条
  • [1] Optimal supply planning in MRP environments for assembly systems with random component procurement times
    Louly, M. A.
    Dolgui, A.
    Hnaien, F.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (19) : 5441 - 5467
  • [2] A simple and effective component procurement policy for stochastic assembly systems
    Gallien, J
    Wein, LM
    [J]. QUEUEING SYSTEMS, 2001, 38 (02) : 221 - 248
  • [3] A Simple and Effective Component Procurement Policy for Stochastic Assembly Systems
    Jérémie Gallien
    Lawrence M. Wein
    [J]. Queueing Systems, 2001, 38 : 221 - 248
  • [4] A supply planning model for multilevel assembly systems under random lead times
    Hnaien, Faicel
    Dolgui, Alexandre
    [J]. 2006 IEEE CONFERENCE ON EMERGING TECHNOLOGIES & FACTORY AUTOMATION, VOLS 1 -3, 2006, : 1271 - +
  • [5] Optimization for supply planning in multi-level assembly systems with stochastic lead-times
    Ben Ammar, Oussama
    Marian, Helene
    Dolgui, Alexandre
    [J]. PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IEEE-IESM 2013), 2013, : 376 - 385
  • [6] Component procurement strategies in decentralized assembly systems under supply uncertainty
    Pan, Wenting
    So, Kut C.
    [J]. IIE TRANSACTIONS, 2016, 48 (03) : 267 - 282
  • [7] Planning models for continuous supply of parts in assembly systems
    Caputo, Antonio C.
    Pelagagge, Pacifico M.
    Salini, Paolo
    [J]. ASSEMBLY AUTOMATION, 2015, 35 (01) : 35 - 46
  • [8] Multi-objective supply planning for two-level assembly systems with stochastic lead times
    Sakiani, R.
    Ghomi, S. M. T. Fatemi
    Zandieh, M.
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (07) : 1325 - 1332
  • [9] A Markov model for supply planning of assembly systems
    Ould-Louly, MA
    Dolgui, A
    [J]. PROCEEDINGS OF THE 2001 IEEE INTERNATIONAL SYMPOSIUM ON ASSEMBLY AND TASK PLANNING (ISATP2001): ASSEMBLY AND DISASSEMBLY IN THE TWENTY-FIRST CENTURY, 2001, : 300 - 305
  • [10] Supply planning for single-level assembly system with stochastic component delivery times and service-level constraint
    Louly, Mohamed-Aly
    Dolgui, Alexandre
    Hnaien, Faicel
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 115 (01) : 236 - 247