Optimal supply planning in MRP environments for assembly systems with random component procurement times

被引:38
|
作者
Louly, M. A. [1 ]
Dolgui, A. [2 ]
Hnaien, F. [2 ]
机构
[1] King Saud Univ, Dept Ind Engn, Coll Engn, Riyadh, Saudi Arabia
[2] Ecole Mines, Ctr Ind Engn & Comp Sci, St Etienne, France
关键词
Supply planning; Assembly systems; MRP environment; Random lead times; Planned lead times optimization; Discrete model; Branch and bound;
D O I
10.1080/00207540802273827
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper examines supply planning in an MRP environment for assembly systems under lead time uncertainties. Indeed. inventory control in a supply chain is crucial for companies who wish to satisfy their customer demands on time as well as controlling costs. A common approach is to use the MRP techniques However. these techniques are based on the supposition that lead times are known. In an actual supply chain the lead times are often random variables. Therefore. we develop all efficient exact model to aid in MRP parametrization under lead time uncertainties, more precisely to calculate planned lead times when the component procurement times are random. The aim is to find the values of planned lead times which minimize the sum of the average component holding cost and the average backlogging cost. The developed approach is based on a mathematical model of this problem with discrete decision variables and a branch and bound algorithm.
引用
收藏
页码:5441 / 5467
页数:27
相关论文
共 50 条
  • [1] A continuous model for supply planning of assembly systems with stochastic component procurement times
    Chauhan, Satyaveer S.
    Dolgui, Alexandre
    Proth, Jean-Marie
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 120 (02) : 411 - 417
  • [2] MRP Offsetting for Assembly Systems with Random Component Delivery Times: A Particular Case
    Louly, Mohamed-Aly
    Dolgui, Alexandre
    [J]. ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: NEW CHALLENGES, NEW APPROACHES, 2010, 338 : 144 - +
  • [3] Component Procurement for an Assembly Supply Chain with Random Capacities and Random Demand
    Cao, Xinyan
    Fang, Xiang
    [J]. DECISION SCIENCES, 2019, 50 (06) : 1259 - 1280
  • [4] Supply management for cost minimization in assembly systems with random component yield times
    J. M. PROTH
    G. MAUROY
    Y. WARDI
    C. CHU
    X. L. XIE
    [J]. Journal of Intelligent Manufacturing, 1997, 8 : 385 - 403
  • [5] Supply management for cost minimization in assembly systems with random component yield times
    Proth, JM
    Mauroy, G
    Wardi, Y
    Chu, C
    Xie, XL
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 1997, 8 (05) : 385 - 403
  • [6] A supply planning model for multilevel assembly systems under random lead times
    Hnaien, Faicel
    Dolgui, Alexandre
    [J]. 2006 IEEE CONFERENCE ON EMERGING TECHNOLOGIES & FACTORY AUTOMATION, VOLS 1 -3, 2006, : 1271 - +
  • [7] Calculating safety stocks for assembly systems with random component procurement lead times: A branch and bound algorithm
    Louly, Mohamed-Aly Ould
    Dolgui, Alexandre
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 199 (03) : 723 - 731
  • [8] Component procurement strategies in decentralized assembly systems under supply uncertainty
    Pan, Wenting
    So, Kut C.
    [J]. IIE TRANSACTIONS, 2016, 48 (03) : 267 - 282
  • [9] Genetic algorithm for supply planning in two-level assembly systems with random lead times
    Hnaien, Faicel
    Delorme, Xavier
    Dolgui, Alexandre
    [J]. ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2009, 22 (06) : 906 - 915
  • [10] Supply planning under uncertainties in MRP environments: A state of the art
    Dolgui, Alexandre
    Prodhon, Caroline
    [J]. ANNUAL REVIEWS IN CONTROL, 2007, 31 (02) : 269 - 279