共 50 条
- [31] Integrated scheduling of flexible manufacturing system using evolutionary algorithms [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 61 (5-8): : 621 - 635
- [32] SCHEDULING ALGORITHMS FOR A 2-MACHINE FLEXIBLE MANUFACTURING SYSTEM [J]. INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 1995, 7 (03): : 207 - 227
- [33] Integrated scheduling of flexible manufacturing system using evolutionary algorithms [J]. The International Journal of Advanced Manufacturing Technology, 2012, 61 : 621 - 635
- [35] An improved design for cellular manufacturing system associating scheduling decisions [J]. Sādhanā, 2019, 44
- [37] An improved design for cellular manufacturing system associating scheduling decisions [J]. SADHANA-ACADEMY PROCEEDINGS IN ENGINEERING SCIENCES, 2019, 44 (07):
- [38] Scheduling flexible manufacturing system based on timed petri net and heuristic search [J]. Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2015, 49 (05): : 708 - 713
- [40] Heuristic optimization strategies for scheduling of manufacturing processes [J]. 2006 29TH INTERNATIONAL SPRING SEMINAR ON ELECTRONICS TECHNOLOGY, 2006, : 228 - +