Heuristic Algorithms for Fowline Cellular Manufacturing System Scheduling

被引:0
|
作者
Li, Yazhi [1 ]
Zhu, Xianjun [1 ]
Xiao, Fangxiong [1 ]
机构
[1] Jinling Inst Technol, Sch Software Engn, Nanjing 211169, Jiangsu, Peoples R China
关键词
FLOWSHOP; MINIMIZATION; MAKESPAN;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Scheduling in cellular manufacturing system (CMS) is treated as group scheduling problem, which assumes all jobs in a family to be processed in the same cell. However, there exists a circumstances called inter-cell move in typical CMS environments, and this fact limits the applicability of group scheduling approaches. In order to solve this kind of problem, this paper considers the scheduling of CMS with inter-cell moves for makespan minimization. Based on the analysis of completion times of machines and jobs, a new mathematical model is proposed. A composite heuristic named N-ILS, two hybrid meta-heuristics named HGA and HHS, are respectively proposed to solve this problem. The performance of these algorithms are evaluated on 810 test problems. The experimental results show that N-ILS is the best in efficiency, HGA performs better than HHS and N-ILS in effectiveness.
引用
收藏
页码:779 / 784
页数:6
相关论文
共 50 条
  • [11] Heuristic Algorithms for Manufacturing and Replacement Strategies of the Production System
    Bucki, Robert
    Chramcov, Bronislav
    Suchanek, Petr
    [J]. JOURNAL OF UNIVERSAL COMPUTER SCIENCE, 2015, 21 (04) : 503 - 525
  • [12] Dynamic scheduling of flexible manufacturing system using heuristic approach
    Kumar M.V.
    Murthy A.N.N.
    Chandrasekhara K.
    [J]. OPSEARCH, 2011, 48 (1) : 1 - 19
  • [13] Sequencing heuristic for scheduling jobs with dependent setups in a manufacturing system
    Chen, Wen-Jinn
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 38 (1-2): : 176 - 184
  • [14] Sequencing heuristic for scheduling jobs with dependent setups in a manufacturing system
    Wen-Jinn Chen
    [J]. The International Journal of Advanced Manufacturing Technology, 2008, 38 : 176 - 184
  • [15] GT Machine Cell Formation Problem In Scheduling For Cellular Manufacturing System Using Meta-Heuristic Method
    Karthikeyan, S.
    Saravanan, M.
    Ganesh, K.
    [J]. INTERNATIONAL CONFERENCE ON MODELLING OPTIMIZATION AND COMPUTING, 2012, 38 : 2537 - 2547
  • [16] Scheduling for cellular manufacturing
    van der Krogt, Roman
    Little, James
    Pulliam, Kenneth
    Hanhilammi, Sue
    Jin, Yue
    [J]. PRINCIPLES AND PRACTICE OF CONSTRAINT PROGRAMMING - CP 2007, 2007, 4741 : 105 - +
  • [17] A new integrated system for loading and scheduling in cellular manufacturing
    Saad, SM
    Baykasoglu, A
    Gindy, NNZ
    [J]. INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2002, 15 (01) : 37 - 49
  • [18] SCHEDULING IN A CELLULAR MANUFACTURING SYSTEM - A SIMULATED ANNEALING APPROACH
    SRIDHAR, J
    RAJENDRAN, C
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (12) : 2927 - 2945
  • [19] Scheduling for backend manufacturing with SPTB heuristic
    Mohile, Milind G.
    Sarin, Subhash C.
    [J]. 2007 IEEE/SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE, 2007, : 309 - +
  • [20] A Heuristic-Embedded Scheduling System for a Pharmaceutical Intermediates Manufacturing Plant
    Kim, Jiyong
    Kim, Junghwan
    Lee, Taeyeong
    Lee, In-Beum
    Moon, Il
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2010, 49 (24) : 12646 - 12653