Research on Construction of Informal Finance Risk Early Warning System and Empirical Data

被引:0
|
作者
Lu Bin [1 ]
Deng Mingran [1 ]
Huang Ling [1 ]
Jiang Xianglin [1 ]
Shen Jun [1 ]
机构
[1] Wuhan Univ Technol, Sch Management, Wuhan 430070, Peoples R China
关键词
Informal Finance Risk; Early Warning Index System; Analytical Hierarchy Process; Weight;
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Informal finance serves as an important complement to the finance system, which can provide private, small and medium-sized enterprises the necessary financial support as well as promote agriculture development while bringing enormous financial risks that cannot be ignored. For the timely discovery and risk prevention, considering its theoretical value and practical significance, this paper sets up an informal finance risk early warning index system by applying early warning system construction principles, integration with Analytical Hierarchy Process and Experts Scoring Method. In addition, this paper chooses data of Hubei Province of China as the empirical analysis object.
引用
收藏
页码:502 / 507
页数:6
相关论文
共 50 条
  • [11] Research on the Crisis Early-warning System of Construction Enterprises
    Zhao, Wanhua
    [J]. 2016 6TH INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY FOR MANUFACTURING SYSTEMS (ITMS 2016), 2016, : 278 - 281
  • [12] Study on the model construction of early warning system of patent risk
    Han, Hongqi
    Wang, Xuefeng
    Liu, Jia
    [J]. PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 408 - 411
  • [13] Research on the early warning system of regional financial risk
    Lin X.
    Peng Y.
    [J]. International Journal of Industrial and Systems Engineering, 2022, 41 (03) : 404 - 415
  • [14] Early warning system of finance stress for India
    Guru, Anuradha
    [J]. INTERNATIONAL REVIEW OF APPLIED ECONOMICS, 2016, 30 (03) : 273 - 300
  • [15] Research on Early Warning and Risk Control Technology in Karst Tunnel Construction
    Liu, Qin
    Li, Shucai
    Zhang, Ning
    Xue, Yiguo
    Yang, Lei
    Zhang, Xiao
    Liu, Rentai
    [J]. PROCEEDINGS OF 2009 INTERNATIONAL SYMPOSIUM ON RISK CONTROL AND MANAGEMENT OF DESIGN, CONSTRUCTION AND OPERATION IN UNDERGROUND ENGINEERING, 2009, : 253 - 256
  • [16] Research on the Construction of Endogenous Industrial Security in Early Warning Index System
    Qian, Jin
    [J]. PROCEEDINGS OF THE 2017 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND MANAGEMENT INNOVATION (MSMI 2017), 2017, 31 : 121 - 125
  • [17] Construction of Risk Early-warning System for Technology Innovation in Enterprises
    Yang, Chao
    Pan, Ping
    [J]. PROCEEDINGS OF THE SECOND CHINA PRIVATE ECONOMY INNOVATION INTERNATIONAL FORUM, 2009, : 16 - 19
  • [18] Study on the Construction of the Risk Early Warning System of Grassland Tourism Environment
    Jia-li-ge
    Chang-an
    Zuo, Lina
    [J]. INFORMATION TECHNOLOGY FOR RISK ANALYSIS AND CRISIS RESPONSE, 2014, 102 : 597 - 601
  • [19] Research on early-warning and control model of enterprise finance based on System Dynamics
    Huang, Yang
    [J]. PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2011, : 294 - 298
  • [20] Research on the Safety Risk Structure and Early Warning System of Agriculture
    Xi, Weidong
    Sun, Yonghai
    Tian, Xiaona
    Wang, Hongying
    Jin, Qingfen
    [J]. INTERNATIONAL CONFERENCE ON AGRICULTURAL RISK AND FOOD SECURITY 2010, 2010, 1 : 462 - 468