Research on Early Warning and Risk Control Technology in Karst Tunnel Construction

被引:0
|
作者
Liu, Qin [1 ]
Li, Shucai [1 ]
Zhang, Ning [1 ]
Xue, Yiguo [1 ]
Yang, Lei [1 ]
Zhang, Xiao [1 ]
Liu, Rentai [1 ]
机构
[1] Shandong Univ, Geotech & Struct Engn Res Ctr, Jinan 250061, Peoples R China
关键词
karst tunnel; risk control; early warning; geological forecast; monitoring measurement;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the construction of mountain tunnel in karst area, there are some disasters, such as collapse, gushing water and so on. In order to avoid casualties and heavy economical losses caused by disaster accidents, construction risk must be warned early and controlled. Common methods used in risk warning and control are introduced with their principles analyzed. Illustrated by the case of Hurongxi Longtan tunnel, TSP 203 system is used to perform the advanced detection in the tunnel before excavation. Water-bearing condition is detected by using infrared water detection apparatus and the peripheral displacement of the tunnel is monitored real-timely in excavation process. Combining the several methods, collapse of the tunnel is predicted successfully. The result indicates that the technology is worth popularizing in similar engineering.
引用
收藏
页码:253 / 256
页数:4
相关论文
共 50 条
  • [1] Construction Safety Risk Assessment and Early Warning of Nearshore Tunnel Based on BIM Technology
    Wu, Ping
    Yang, Linxi
    Li, Wangxin
    Huang, Jiamin
    Xu, Yidong
    [J]. JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2023, 11 (10)
  • [2] Research on the Early-warning for Construction Project Cost Risk
    Liu Zi-mei
    Xie Ke-fan
    [J]. 2013 FOURTH INTERNATIONAL CONFERENCE ON DIGITAL MANUFACTURING AND AUTOMATION (ICDMA), 2013, : 1127 - 1129
  • [3] Construction of Risk Early-warning System for Technology Innovation in Enterprises
    Yang, Chao
    Pan, Ping
    [J]. PROCEEDINGS OF THE SECOND CHINA PRIVATE ECONOMY INNOVATION INTERNATIONAL FORUM, 2009, : 16 - 19
  • [4] Study on lining water pressure distribution and early warning control standard of in-service karst tunnel
    Fan Hao-bo
    Chen Hong-wen
    Zhao Dong-ping
    Zhu Zheng-guo
    Zhao Zi-yu
    Zhu Yong-quan
    Gao Xin-qiang
    [J]. ROCK AND SOIL MECHANICS, 2024, 45 (07) : 2153 - 2166
  • [5] Construction risk control technology of a large tunnel complex in urban area
    Gao, Xinqiang
    Kong, Chao
    Wu, Daifeng
    Lu, Feng
    Liu, Maoyi
    Wang, Haiyan
    Ren, Songbo
    [J]. FRONTIERS IN EARTH SCIENCE, 2023, 10
  • [6] Risk Analysis and Assessment of Shield Tunnel Construction in Karst Area
    Wang, Xiang
    Lu, Haolun
    Su, Wanying
    Zhu, Xiaohui
    [J]. 2022 8TH INTERNATIONAL CONFERENCE ON HYDRAULIC AND CIVIL ENGINEERING: DEEP SPACE INTELLIGENT DEVELOPMENT AND UTILIZATION FORUM, ICHCE, 2022, : 674 - 680
  • [7] Study on Early Warning Mechanism on Water Inrush Hazards in Construction of High Risk Subsea Tunnel
    Xue, Yi-Guo
    Li, Shu-Cai
    Su, Mao-Xin
    Li, Wei-Teng
    Zhao, Yan
    [J]. PROCEEDINGS OF 2009 INTERNATIONAL SYMPOSIUM ON RISK CONTROL AND MANAGEMENT OF DESIGN, CONSTRUCTION AND OPERATION IN UNDERGROUND ENGINEERING, 2009, : 360 - 364
  • [8] Research on Construction of Informal Finance Risk Early Warning System and Empirical Data
    Lu Bin
    Deng Mingran
    Huang Ling
    Jiang Xianglin
    Shen Jun
    [J]. PROCEEDINGS OF THE 10TH INTERNATIONAL CONFERENCE ON INNOVATION AND MANAGEMENT, 2013, : 502 - 507
  • [9] Research of technology and system of tunnel microseismic monitoring and rockburst early warning based on deep learning
    Li, Tianbin
    Xu, Weihao
    Ma, Chunchi
    Zhang, Hang
    Zhang, Yuxuan
    Dai, Kunkun
    [J]. Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2024, 43 (05): : 1041 - 1063
  • [10] Financial Risk Analysis and Early Warning Research Based on Data Mining Technology
    Hou, Yan
    Yuan, Ziyan
    [J]. 2018 INTERNATIONAL SYMPOSIUM ON POWER ELECTRONICS AND CONTROL ENGINEERING (ISPECE 2018), 2019, 1187