Optimizing with constraints: A case study in scheduling maintenance of electric power units

被引:0
|
作者
Frost, D [1 ]
Dechter, R [1 ]
机构
[1] Univ Calif Irvine, Dept Informat & Comp Sci, Irvine, CA 92697 USA
来源
PRINCIPLES AND PRACTICE OF CONSTRAINT PROGRAMMING - CP98 | 1998年 / 1520卷
关键词
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
引用
收藏
页码:469 / 469
页数:1
相关论文
共 50 条
  • [21] Evolutionary program ming-based maintenance scheduling of power generating units
    El-Sharkh, MY
    El-Keib, AA
    Choi, J
    Elagtal, I
    2004 INTERNATIONAL CONFERENCE ON PROBABILISTIC METHODS APPLIED TO POWER SYSTEMS, 2004, : 141 - 144
  • [22] MPEC approach for solving preventive maintenance scheduling of power units in a market environment
    Toutounchi, A. Naebi
    Shenava, S. J. Seyed
    Taheri, S. S.
    Shayeghi, H.
    TRANSACTIONS OF THE INSTITUTE OF MEASUREMENT AND CONTROL, 2018, 40 (02) : 436 - 445
  • [23] Optimal Scheduling of Power Generation Units using Differential Evolution Approach: A Case Study
    Alharthi, Hussain
    Alshehri, Jaber
    Khalid, Muhammad
    2019 8TH INTERNATIONAL CONFERENCE ON RENEWABLE ENERGY RESEARCH AND APPLICATIONS (ICRERA 2019), 2019, : 295 - 300
  • [24] The strategy for the maintenance scheduling of the generating units
    Basaran, Ü
    Kurban, M
    LESCOPE'03 : 2003 LARGE ENGINEERING SYSTEMS CONFERENCE ON POWER ENGINEERING, CONFERENCE PROCEEDINGS: ENERGY FOR THE FUTURE, 2003, : 172 - 176
  • [25] UNIT MAINTENANCE SCHEDULING WITH FUEL CONSTRAINTS
    ALKHAMIS, TM
    VEMURI, S
    LEMONIDIS, L
    YELLEN, J
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1992, 7 (02) : 933 - 939
  • [27] Optimizing power plant maintenance
    Abbott, P
    POWER, 2004, 148 (09) : 26 - +
  • [28] Scheduling pumpoff operations in onshore oilfields under electric-power constraints
    Camponogara, Eduardo
    Oliveira, Mateus Dubiela
    Schmitz de Aguiar, Marco Aurelio
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 247 (03) : 945 - 956
  • [29] Goal programming approach to maintenance scheduling of generating units in large scale power systems
    Moro, LM
    Ramos, A
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (03) : 1021 - 1027
  • [30] Train maintenance personnel shift scheduling: case study
    Gencer, Muhammed Abdullah
    Eren, Tamer
    Alakas, Haci Mehmet
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2024, 36 (02) : 533 - 566