Scheduling pumpoff operations in onshore oilfields under electric-power constraints

被引:2
|
作者
Camponogara, Eduardo [1 ]
Oliveira, Mateus Dubiela [1 ]
Schmitz de Aguiar, Marco Aurelio [1 ]
机构
[1] Univ Fed Santa Catarina, Dept Automat & Syst Engn, BR-88040900 Florianopolis, SC, Brazil
关键词
OR in energy; Integer programming; Onshore oilfields; Sucker-rod pumping; Pumpoff scheduling; LINEAR OPTIMIZATION; PROGRAMS;
D O I
10.1016/j.ejor.2015.06.001
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In onshore oilfields, several sucker-rod pumps are deployed over a large geographic area to lift oil from the bottom of production wells. Powered by electric rotary machines, the rod pumps operate according to cyclic control policies that alternate between on and off pumping periods which are designed to drive maximum production. This cyclic behavior gives rise to the problem of scheduling pumpoff operations in order to minimize the system power peak and thereby smoothen the power-consumption profile. To this end, this paper develops MILP formulations for the coordination of control policies and their reconfiguration during operations. Following a column-based approach or using integer variables to model the power-consumption profile, the resulting MILP formulations are put to the test in a host of synthetic, but representative oilfields. (C) 2015 Elsevier B.V. and Association of European Operational Research Societies (EURO) within the International Federation of Operational Research Societies (IFORS). All rights reserved.
引用
收藏
页码:945 / 956
页数:12
相关论文
共 50 条