共 50 条
- [31] Continuous improvement processes using Lean Management tools. A case study [J]. 4TH INTERNATIONAL CONFERENCE ON COMPUTING AND SOLUTIONS IN MANUFACTURING ENGINEERING 2016 - COSME'16, 2017, 94
- [33] Assembly Process Improvement in Company S: A Lean Six Sigma Case Study [J]. ENGINEERING SOLUTIONS FOR MANUFACTURING PROCESSES, PTS 1-3, 2013, 655-657 : 2371 - +
- [34] Complexity Analysis of a Business Process Automation: case study on a Healthcare Organization [J]. CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS/INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT/CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES, CENTERIS/PROJMAN / HCIST 2015, 2015, 64 : 1226 - 1231
- [35] The Impact of the Application of Lean Tools for Improvement of Process in a Plastic Company: a case study [J]. 29TH INTERNATIONAL CONFERENCE ON FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING (FAIM 2019): BEYOND INDUSTRY 4.0: INDUSTRIAL ADVANCES, ENGINEERING EDUCATION AND INTELLIGENT MANUFACTURING, 2019, 38 : 765 - 775
- [36] Lean Improvement Practices: Lessons from Healthcare Service Delivery Chains [J]. IFAC PAPERSONLINE, 2016, 49 (12): : 1158 - 1163
- [38] CONCEPT CATEGORIZATION AND KNOWLEDGE ORGANIZATION IN SPECIALIZED DATABASES - A CASE-STUDY [J]. INTERNATIONAL CLASSIFICATION, 1991, 18 (02): : 92 - 97
- [39] The Implementation of the Lean Thinking Concept for Reducing Waste: A Study Case in the Leather Tanning Process [J]. 2020 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2020, : 992 - 995