Outsourcing contracts and ordering decisions of a supply chain under multi-dimensional uncertainties

被引:23
|
作者
Chen, Kebing [1 ]
Zhao, Hongmei [2 ]
Xiao, Tiaojun [3 ,4 ]
机构
[1] Nanjing Univ Aeronaut & Astronaut, Coll Econ & Management, Nanjing 210016, Jiangsu, Peoples R China
[2] Nanjing Univ Aeronaut & Astronaut, Dept Math, Nanjing 210016, Jiangsu, Peoples R China
[3] Nanjing Univ Finance & Econ, Inst Game Behav & Operat Management, Nanjing 210046, Jiangsu, Peoples R China
[4] Nanjing Univ, Sch Management & Engn, Nanjing 210093, Jiangsu, Peoples R China
基金
中国国家自然科学基金;
关键词
Supply chain management; Asymmetric information; Outsourcing; Revelation mechanism; Game theory; LEAD TIME; COST INFORMATION; RANDOM YIELD; MANAGEMENT; COORDINATION; COMPETITION; DEMAND; EXTENSION; RETAILER; CAPACITY;
D O I
10.1016/j.cie.2019.02.010
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
We consider a supply chain in which a manufacturer with random yield sells the product through a retailer, where the overflowed order of the retailer may be fulfilled by the manufacturer's outsourcing product. The inherent uncertainties include demand uncertainty, yield uncertainty, and outsourcing information asymmetry. Two contingent outsourcing contracts are studied based on whether the delivery lead-time quotation is adopted or not. We study how the two outsourcing contracts affect supply chain decision-makings and profits by introducing a backup supplier with private cost information. By employing backward induction technique, we obtain a closed-form analytical solution for backup supplier selection and ordering decisions. The manufacturer can outsource the retailer's overflowed order to a backup supplier when the actual yield is low. In the presence of multi-dimensional uncertainties, there exists robustness for both outsourcing contracts. Depending on both the yield and the backup supplier's cost type, the manufacturer makes one of three choices to outsource production: choosing both types of the backup supplier, choosing only the low-cost backup supplier, or choosing neither. The outsourcing quantity may be a part or all of the retailer's overflowed order. Unlike the contract without constraint on lead-time, the quotation of the delivery lead-time endows the manufacturer with the ability of revealing the true cost information, thus it can improve the manufacturer's outsourcing profit. However, the quotation of delivery lead-time may make the whole supply chain less efficient.
引用
收藏
页码:127 / 141
页数:15
相关论文
共 50 条
  • [21] Reconfiguration of manufacturing supply chains considering outsourcing decisions and supply chain risks
    Tian, Qi
    Guo, Weihong
    JOURNAL OF MANUFACTURING SYSTEMS, 2019, 52 : 217 - 226
  • [22] Decisions and Coordination in E-Commerce Supply Chain under Logistics Outsourcing and Altruistic Preferences
    Wang, Yuyan
    Yu, Zhaoqing
    Shen, Liang
    Fan, Runjie
    Tang, Rongyun
    MATHEMATICS, 2021, 9 (03) : 1 - 23
  • [23] Supply chain capacity and outsourcing decisions: The dynamic interplay of demand and supply uncertainty
    Kouvelis, Panos
    Milner, Joseph M.
    IIE Transactions (Institute of Industrial Engineers), 2002, 34 (08): : 717 - 728
  • [24] Supply chain capacity and outsourcing decisions: the dynamic interplay of demand and supply uncertainty
    Kouvelis, P
    Milner, JM
    IIE TRANSACTIONS, 2002, 34 (08) : 717 - 728
  • [25] A mathematical model for optimizing a biofuel supply chain with outsourcing decisions under the carbon trading mechanism
    Memari, Yasaman
    Memari, Ashkan
    Ebrahimnejad, Sadoullah
    Ahmad, Robiah
    BIOMASS CONVERSION AND BIOREFINERY, 2023, 13 (02) : 1047 - 1070
  • [26] Retailer's Ordering Policy Based on Coordination Contracts Under Supply Chain Financing Circumstance
    Xue, Min
    Yang, Wen-sheng
    INTERNATIONAL CONFERENCE ON SIMULATION, MODELLING AND MATHEMATICAL STATISTICS (SMMS 2015), 2015, : 322 - 327
  • [27] Contracts choice for supply chain under inflation
    Wan, Nana
    Chen, Xu
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2018, 25 (06) : 1907 - 1925
  • [28] Optimal production and procurement decisions in a supply chain with an option contract and partial backordering under uncertainties
    Hu, Fei
    Lim, Cheng-Chew
    Lu, Zudi
    APPLIED MATHEMATICS AND COMPUTATION, 2014, 232 : 1225 - 1234
  • [29] Pricing and green level decisions of a green supply chain with governmental interventions under fuzzy uncertainties
    Yang, Deyan
    Xiao, Tiaojun
    JOURNAL OF CLEANER PRODUCTION, 2017, 149 : 1174 - 1187
  • [30] A Two-stage Discriminating Framework for Making Supply Chain Operation Decisions under Uncertainties
    Gu, H.
    Rong, G.
    CHEMICAL AND BIOCHEMICAL ENGINEERING QUARTERLY, 2010, 24 (01) : 51 - 66