Evaluating design-build procurement documents for highway projects - How good are they?

被引:0
|
作者
Ernzen, J [1 ]
Vogelsang, K [1 ]
机构
[1] Arizona State Univ, Del E Webb Sch Construct, Tempe, AZ 85287 USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Recent innovations by the Arizona Department of Transportation in the use of design-build procurement for highway construction are presented. Explosive population growth in Arizona has pushed the department to the limits of its capacity and challenged it to develop innovative ways to stretch its resources to meet the constituents' needs. In 1996 the department spearheaded the passage of a pilot design-build law aimed at completing public construction projects more rapidly than could be done using traditional methods. An evaluation made of the procurement documents used for the second design-build project in this pilot program is described. The project reconstructed an extremely congested 12.9-km (8-mi) segment of Interstate 17, a primary artery carrying 180,000 vehicles per day through the city of Phoenix, widening it from 6 lanes to 10. The department used a two-step method for the selection of the winning design-build team from both a request for qualification and a request for proposal. Both documents were evaluated for the clarity of thought and the fairness of the point distribution methodology used by the selection teams. The responding team were also surveyed about their costs expended during the proposal process. The primary method of data gathering was by written survey of all the proposing team followed by unstructured interviews with responding principals. Analysis of the data gathered clearly showed the areas in which the procurement documents were unclear and in which the department needed to make corrections for future projects.
引用
收藏
页码:148 / 158
页数:11
相关论文
共 50 条
  • [1] Stipends in Highway Design-Build Projects
    Chaudhary, Niranjan A.
    Esmaeili, Behzad
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2020, 36 (05)
  • [2] Procurement of Design-Build Services: Two-Phase Selection for Highway Projects
    Migliaccio, G. C.
    Gibson, G. E.
    O'Connor, J. T.
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2009, 25 (01) : 29 - 39
  • [3] Comparing procurement methods for design-build projects
    El Wardani, MA
    Messner, JI
    Horman, MJ
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (03) : 230 - 238
  • [4] Selecting appropriate projects for design-build procurement
    Molenaar, KR
    [J]. PROFITABLE PARTNERING IN CONSTRUCTION PROCUREMENT, 1999, : 349 - 359
  • [5] Benchmarking of large design-build highway projects
    Shrestha, Pramen Prasad
    Migilaccio, Giovanni Ciro
    O'Connor, James T.
    Gibson, G. Edward, Jr.
    [J]. TRANSPORTATION RESEARCH RECORD, 2007, (1994) : 17 - 25
  • [6] Evaluating the Influence of Differing Geotechnical Risk Perceptions on Design-Build Highway Projects
    Castro-Nova, I.
    Gad, G. M.
    Touran, A.
    Cetin, B.
    Gransberg, D. D.
    [J]. ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART A-CIVIL ENGINEERING, 2018, 4 (04):
  • [7] Holistic Performance Evaluation of Highway Design-Build Projects
    Choi, Kunhee
    Jung, Inwoo
    Yin, Yangtian
    Gurganus, Charles
    Jeong, H. David
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2020, 36 (04)
  • [8] Design-build evolves as a tool in highway and bridge projects
    [J]. 1600, McGraw-Hill Companies (275):
  • [9] Performance of performance specifications in design-build highway projects
    Brochner, Jan
    Silfwerbrand, Johan
    [J]. CONSTRUCTION ECONOMICS AND BUILDING, 2019, 19 (02): : 111 - 125
  • [10] Geotechnical issues with large design-build highway projects
    Higbee, JB
    [J]. SOIL MECHANICS 2002: SOILS, GEOLOGY, AND FOUNDATIONS, 2002, (1808): : 147 - 152