A solution framework for the multi-mode resource-constrained cross-dock scheduling problem

被引:17
|
作者
Hermel, Dror [1 ]
Hasheminia, Hamed [2 ]
Adler, Nicole [3 ]
Fry, Michael J. [4 ]
机构
[1] Ariel Univ, Ariel, Israel
[2] San Francisco State Univ, San Francisco, CA USA
[3] Hebrew Univ Jerusalem, Jerusalem, Israel
[4] Univ Cincinnati, Cincinnati, OH 45221 USA
关键词
Cross-dock; Dock-door assignment; Resource allocation; Scheduling; Facility logistics; ASSIGNMENT PROBLEM; CROSSDOCKING; OPERATIONS; TERMINALS; TRUCKS; COSTS;
D O I
10.1016/j.omega.2015.06.002
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper we propose a framework for shift-level container scheduling and resource allocation decisions at a cross-dock facility. The Multi-Mode Resource-Constrained Cross-Dock Scheduling Problem (MRCDSP) approach minimizes material flow and schedules inbound and outbound containers to dock-doors such that the total processing time is minimized subject to the resource constraints at the cross-dock. While container scheduling and resource allocation problems at cross-dock facilities have been studied previously in isolation, our work is the first to consider a complete view of cross-dock operations providing optimal container to dock-door allocation, and a makespan minimizing schedule of containers to the cross-dock. We present a comprehensive framework that includes identification of container clusters to reduce the problem size, a container-to-dock-door assignment algorithm, and a container clusters scheduling model that is solvable for practically sized problems. In a comparative numeric study based on data simulating a cross-dock facility, our approach is shown to outperform current practice, reducing the average time required for processing a set of containers by 37% and reducing the weighted-distance material traveled within the cross-dock by 45%. (c) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:157 / 170
页数:14
相关论文
共 50 条
  • [31] A Benders decomposition algorithm for the multi-mode resource-constrained multi-project scheduling problem with uncertainty
    Sadeghloo, Maryam
    Emami, Saeed
    Divsalar, Ali
    ANNALS OF OPERATIONS RESEARCH, 2024, 339 (03) : 1637 - 1677
  • [32] Memetic algorithm for multi-mode resource-constrained project scheduling problems
    Shixin Liu
    Di Chen
    Yifan Wang
    Journal of Systems Engineering and Electronics, 2014, 25 (04) : 609 - 617
  • [33] Local search for nonpreemptive multi-mode resource-constrained project scheduling
    Kolisch, R
    Drexl, A
    IIE TRANSACTIONS, 1997, 29 (11) : 987 - 999
  • [34] Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem
    Kannimuthu, Marimuthu
    Raphael, Benny
    Ekambaram, Palaneeswaran
    Kuppuswamy, Ananthanarayanan
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (04) : 893 - 916
  • [35] Scatter Search for Multi-mode Resource-constrained Project Scheduling Problems
    Pourghaderi, A. R.
    Torabi, S. A.
    Talebi, J.
    IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 163 - 167
  • [36] Multi-mode resource-constrained scheduling for complex product design tasks
    Li, Yingzi
    Zhang, Shuo
    Zhang, Xiaodong
    Luo, Le
    MATERIALS AND MANUFACTURING TECHNOLOGY, PTS 1 AND 2, 2010, 129-131 : 566 - 571
  • [37] Multi-mode resource-constrained project scheduling with uncertain activity cost
    Xie, Fang
    Li, Haitao
    Xu, Zhe
    EXPERT SYSTEMS WITH APPLICATIONS, 2021, 168
  • [38] Multi-mode resource-constrained project scheduling problem with multiple shifts and dynamic energy prices
    Peng, Wuliang
    Yu, Dongmin
    Xie, Fang
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024,
  • [39] A faster exact method for solving the robust multi-mode resource-constrained project scheduling problem
    Bold, Matthew
    Goerigk, Marc
    OPERATIONS RESEARCH LETTERS, 2022, 50 (05) : 581 - 587
  • [40] A Modified NSGA-II for the Multiobjective Multi-mode Resource-Constrained Project Scheduling Problem
    Vanucci, Sanderson C.
    Bicalho, Rafael
    Carrano, Eduardo G.
    Takahashi, Ricardo H. C.
    2012 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2012,