Integrated Capacity Planning and Production Control of an Assembly Manufacturing System

被引:7
|
作者
Chen, Wenliang [1 ,2 ]
Wang, Zheng [1 ,2 ]
机构
[1] Southeast Univ, Minist Educ, Key Lab Measure & Control Complex Engn Syst, Nanjing 210096, Peoples R China
[2] Southeast Univ, Sch Automat, Nanjing 210096, Peoples R China
基金
中国国家自然科学基金;
关键词
Capacity planning; Production control; Manufacturing systems; Assembly systems; Probability distribution; Steady-state; Assembly system; capacity planning; optimal production control; performance evaluation; steady-state probability distribution; TO-ORDER SYSTEM; INVENTORY CONTROL; PERFORMANCE EVALUATION; OPTIMIZATION; MODEL;
D O I
10.1109/TEM.2019.2915055
中图分类号
F [经济];
学科分类号
02 ;
摘要
For an assembly manufacturing system, its capacity planning problem and production control problem are usually considered separately. However, production capacity cannot exert its maximum productivity without employing optimal production control; and optimal production control may not satisfy the demand without sufficient production capacity. Therefore, it is important to jointly optimize capacity planning and production control. First, the mathematical formulation of integrated production control and capacity planning problem for an assembly manufacturing system with multiple upstream production lines and one downstream assembly line is proposed in this paper. Second, we develop a method to obtain the marginal probability distribution of the inventory level in the assembly system, which can be employed to calculate the average production cost under an approximate optimal production control policy. Since optimal control policy is subject to production capacity (i.e., machine number), we employ the integer programming method to optimize the machine number (i.e., production capacity), which consequently influences the control policy. Numerical experiments are conducted to verify the correctness of the method of calculating steady-state probability distribution, and the effectiveness of the algorithm of integrated optimization of production control and production capacity.
引用
收藏
页码:868 / 880
页数:13
相关论文
共 50 条
  • [31] An integrated intelligent approach and system for rapid robotic assembly prototyping, planning and control
    Zha, XF
    [J]. ICRA '99: IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS 1-4, PROCEEDINGS, 1999, : 108 - 113
  • [32] Integrated intelligent approach and system for rapid robotic assembly prototyping, planning and control
    Zha, X.F.
    [J]. Proceedings - IEEE International Conference on Robotics and Automation, 1999, 1 : 108 - 113
  • [33] A MANUFACTURING PLANNING AND CONTROL-SYSTEM FOR A FLEXIBLE MANUFACTURING SYSTEM
    SLOMP, J
    ZIJM, WHM
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 1993, 10 (1-2) : 109 - 114
  • [34] TOC/DBR based production planning and control in a manufacturing system with multiple system bottlenecks
    Guan, Z. L.
    Peng, Y. F.
    Yang, X. L.
    Shao, X. Y.
    [J]. 2007 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2007, : 1078 - 1082
  • [35] An integrated production planning and tool planning model for flexible manufacturing systems
    Mohamed, ZM
    Kumar, A
    Motwani, J
    [J]. DECISION SCIENCES INSTITUTE, 1997 ANNUAL MEETING, PROCEEDINGS, VOLS 1-3, 1997, : 1182 - 1184
  • [36] A model for integrated production planning in cellular manufacturing systems
    Chen, M.
    [J]. Integrated Manufacturing Systems, 2001, 12 (04): : 275 - 284
  • [37] Production planning for integrated primary and secondary lumber manufacturing
    Donald, WS
    Maness, TC
    Marinescu, MV
    [J]. WOOD AND FIBER SCIENCE, 2001, 33 (03): : 334 - 344
  • [38] Assembly modeling for the integrated system of assembly sequences planning and DFA
    Su, Qiang
    Lin, Zhi-hang
    [J]. Jixie Kexue Yu Jishu/Mechanical Science and Technology, 2000, 19 (03): : 466 - 469
  • [39] Integrated Virtual Assembly Process Planning System
    Liu Jianhua
    Hou Weiwei
    Shang Wei
    Ning Ruxin
    [J]. CHINESE JOURNAL OF MECHANICAL ENGINEERING, 2009, 22 (05) : 717 - 728
  • [40] A case study on integrated production planning and scheduling in a three-stage manufacturing system
    Yan, Hong-Sen
    Zhang, Xiao-Dong
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2007, 4 (01) : 86 - 92