Production planning for integrated primary and secondary lumber manufacturing

被引:0
|
作者
Donald, WS
Maness, TC
Marinescu, MV
机构
[1] Perceptron Forest Prod Div, Surrey, BC V4A 3H4, Canada
[2] Univ British Columbia, Fac Forestry, Vancouver, BC V6T 1Z4, Canada
来源
WOOD AND FIBER SCIENCE | 2001年 / 33卷 / 03期
关键词
value-added lumber; production planning; linear programming; optimization;
D O I
暂无
中图分类号
S7 [林业];
学科分类号
0829 ; 0907 ;
摘要
This paper describes two linear programming models that were developed for production planning in value-added lumber manufacturing facilities. One model is designed for nonintegrated value-added facilities; the other is designed for value-added facilities integrated with a sawmill. The models were then used to explore the financial benefits for a sawmill to integrate a value-added lumber manufacturing facility at the back end of the mill. Net revenues are compared from the sawmill's point of view for two experimental cases. In Case 1 the sawmill sells its entire lumber production to the market (including to an independent value-added facility). In Case 2, the sawmill sells only the lumber that it is not directed to the value-added facility for further processing. Net revenue for Case 2 exceeds the net revenue of Case 1 by 10%. Results shown demonstrate that production decisions in the value-added facility had a significant influence on production decisions in the sawmill.
引用
收藏
页码:334 / 344
页数:11
相关论文
共 50 条
  • [1] An integrated production planning and tool planning model for flexible manufacturing systems
    Mohamed, ZM
    Kumar, A
    Motwani, J
    [J]. DECISION SCIENCES INSTITUTE, 1997 ANNUAL MEETING, PROCEEDINGS, VOLS 1-3, 1997, : 1182 - 1184
  • [2] A model for integrated production planning in cellular manufacturing systems
    Chen, M.
    [J]. Integrated Manufacturing Systems, 2001, 12 (04): : 275 - 284
  • [3] AN INTEGRATED PRODUCTION PLANNING AND SCHEDULING SYSTEM FOR MANUFACTURING PLANTS
    BUCKLEY, J
    CHAN, A
    GRAEFE, U
    NEELAMKAVIL, J
    SERRER, M
    THOMSON, V
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 1988, 4 (3-4) : 517 - 523
  • [4] Primary versus secondary production techniques in US manufacturing
    Mattey, J
    ten Raa, T
    [J]. REVIEW OF INCOME AND WEALTH, 1997, (04) : 449 - 464
  • [5] Integrated Capacity Planning and Production Control of an Assembly Manufacturing System
    Chen, Wenliang
    Wang, Zheng
    [J]. IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2021, 68 (03) : 868 - 880
  • [6] An integrated approach for production planning and scheduling in flexible manufacturing systems
    Li, TK
    Wang, J
    Kimura, Y
    [J]. ISIM'2000: PROCEEDINGS OF THE FIFTH CHINA-JAPAN INTERNATIONAL SYMPOSIUM ON INDUSTRIAL MANAGEMENT, 2000, : 161 - 166
  • [7] A comparison of optimization models for lumber production planning
    Vergara, Francisco P.
    Palma, Cristian D.
    Sepulveda, Hector
    [J]. BOSQUE, 2015, 36 (02): : 239 - 246
  • [8] A computer vision system for lumber production planning
    Bhandarkar, SM
    Faust, TD
    Tang, MJ
    [J]. FOURTH IEEE WORKSHOP ON APPLICATIONS OF COMPUTER VISION - WACV'98, PROCEEDINGS, 1998, : 134 - 139
  • [9] Forest thinnings for integrated lumber and paper production
    Zhu, J. Y.
    Vahey, D. W.
    Scott, C. T.
    Myers, G. C.
    [J]. FOREST PRODUCTS JOURNAL, 2007, 57 (11) : 8 - 13
  • [10] Integrated Optimization of Production Planning for Large and Complex Discrete Manufacturing System
    Yang, Xiao-ying
    Wang, Xue
    Shi, Guo-hong
    [J]. PROCEEDINGS OF 2012 3RD INTERNATIONAL ASIA CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION (IEMI2012), 2013, : 127 - 137