Prediction of Cost Overrun Risk in Construction Projects

被引:12
|
作者
Plebankiewicz, Edyta [1 ]
Wieczorek, Damian [1 ]
机构
[1] Cracow Univ Technol, Fac Civil Engn, Div Management Civil Engn, PL-31155 Krakow, Poland
关键词
cost overrun; construction project; fuzzy sets; fuzzy inference model of Mamdani; INFRASTRUCTURE PROJECTS; ESTIMATION MODEL; INDUSTRY;
D O I
10.3390/su12229341
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The paper proposes a cost overrun risks prediction model, the structure of which is based on the fuzzy inference model of Mamdani. The model consists of numerous inputs and one output (MISO, multi-input-single-output), based on processes running consecutively in three blocks (the fuzzy block, the interference block, and the block of sharpening the representative output value). The input variables of the model include the share of element costs in the building costs (SE), predicted changes in the number of works (WC), and expected changes in the unit price (PC). The developed rule base makes it possible to determine the risk of cost overruns in the following categories: "very low", "quite low", "average", "quite high", and "very high". Twenty-seven rules were assumed in the interference block. The operation of the model was illustrated by the example of selected elements of a road object and was validated by checking the correctness of the assumptions made at the design stage of the inference block rule base. It has been proven that with the increase of the share of element costs in the building costs (SE), predicted changes in the number of works (WC), and expected changes in the unit price (PC), the value of the risk exceeding the costs of a given element of the construction project (R) increases naturally and smoothly. It was emphasized in the conclusions that the cost overrun risks prediction model is intended for general contractors who subcontract many stages of works to their subcontractors in accordance with the agreed division into work elements.
引用
收藏
页码:1 / 15
页数:15
相关论文
共 50 条
  • [41] Identifying Critical Time-Overrun and Risk Factors in Kuwait's Construction Projects
    Al Otaibi, Srour
    Al Zubaidi, Hassan
    BEYOND BORDERS: NEW GLOBAL MANAGEMENT DEVELOPMENT CHALLENGES AND OPPORTUNITIES, 2007, 16 : 624 - +
  • [42] A Model for Risk Cost and Bidding Price Prediction based on Risk Information in Plant Construction Projects
    Kang, Hyun-Wook
    Kim, Yong-Su
    KSCE JOURNAL OF CIVIL ENGINEERING, 2018, 22 (11) : 4215 - 4229
  • [43] A Model for Risk Cost and Bidding Price Prediction based on Risk Information in Plant Construction Projects
    Hyun-Wook Kang
    Yong-Su Kim
    KSCE Journal of Civil Engineering, 2018, 22 : 4215 - 4229
  • [44] Causative Factors of Cost Overrun in Building Projects of Pakistan
    Sohu, Samiullah
    Abdullah, Abd Halid
    Nagapan, Sasitharan
    Memon, Nafees Ahmed
    Yunus, Riduan
    Hasmori, Muhammad Fikri
    INTERNATIONAL JOURNAL OF INTEGRATED ENGINEERING, 2018, 10 (09): : 122 - 126
  • [45] Cost overrun factor analysis for hospital projects in Vietnam
    Soo-Yong Kim
    Kiet Nguyen Tuan
    Jae Do Lee
    Hai Pham
    Van Truong Luu
    KSCE Journal of Civil Engineering, 2018, 22 : 1 - 11
  • [46] What causes cost overrun in transport infrastructure projects?
    Flyvbjerg, B
    Holm, MKS
    Buhl, SL
    TRANSPORT REVIEWS, 2004, 24 (01) : 3 - 18
  • [47] Research on Influencing Factors and Control Measures of Construction Cost Overrun in China's Expressway Projects
    Chen S.
    Fan X.
    Cai B.
    International Journal of Fuzzy System Applications, 2023, 12 (01)
  • [48] Cost Overrun Risk Assessment in the Public Investment Projects: an Empirically-Grounded Research
    Jasiukevicius, Linas
    Vasiliauskaite, Asta
    INZINERINE EKONOMIKA-ENGINEERING ECONOMICS, 2015, 26 (03): : 245 - 254
  • [49] Causes of Time Overrun in Construction of Building Projects in Pakistan
    Soomro, Faheem Ahmed
    Memon, Muhammed Jaffar
    Chandio, Abdul Fattah
    Sohu, Samiullah
    Soomro, Rizwanullah
    ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2019, 9 (01) : 3762 - 3764
  • [50] Cost overrun factor analysis for hospital projects in Vietnam
    Kim, Soo-Yong
    Kiet Nguyen Tuan
    Lee, Jae Do
    Pham, Hai
    Van Truong Luu
    KSCE JOURNAL OF CIVIL ENGINEERING, 2018, 22 (01) : 1 - 11