Identification of Delay Factor in Oman Construction Industry

被引:6
|
作者
Latif, Qadir Bux Alias Imran [1 ]
Al Saadi, Aysha Mehfoodh Dhiyab [1 ]
Rahman, Ismail Abdul [2 ]
机构
[1] Univ Nizwa, Coll Engn, Dept Civil Engn, POB 33, Nizwa 616, Oman
[2] Univ Tun Hussein Onn Malaysia UTHM, Fac Civil & Environm Engn, Parit Raja 86400, Malaysia
关键词
delay; time overrun; construction; causes; factors; management; Muscat; Oman; PROJECTS;
D O I
10.30880/ijscet.2019.10.01.004
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction industry is second most significant and largest industry in gulf countries that continuously and rapidly growing. However the decline in economies of gulf countries due to fluctuated oil has ambiguous effect on the construction industry. Like other countries around the world, construction industries in gulf region also facing many problems and amongst the most common problem is delay/time overrun. This paper aims to identify various factors in construction management which causing delay in construction projects at Muscat, Khabourah, Bidbid, Musanah and Sohar cities in OMAN. Fourty eight (48) delay factors identified from literature around the world and organized in structured questionnaire survey form. Delay factors were categorized into five major groups in construction process which are Planning, Design, Construction, Finishing, and Miscellaneous. The forms were distributed amongst the construction experts focusing clients, consultants and contractors involved in the construction projects. A total of 105 collected data were analyzed by using Average Index method for each factor. Furthermore, delay causing factors analyzed by individual response of client, consultant and contractor prospective. The analysis identified that 'changes in scope of project', 'lack of communication between parties', 'shortage of skilled labour', 'mistakes during construction', and 'insufficient data collection and survey before designing'; are the most significant causes in each category respectively. The result of this study is useful to create or/and improve guideline considering delay, to avoid problems in looming construction.
引用
收藏
页码:34 / 45
页数:12
相关论文
共 50 条
  • [1] Causes of delay in construction projects in Oman
    Umar, Tariq
    [J]. MIDDLE EAST JOURNAL OF MANAGEMENT, 2018, 5 (02) : 121 - 136
  • [2] Briefing: Cost of accidents in the construction industry of Oman
    Umar, Tariq
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MUNICIPAL ENGINEER, 2017, 170 (02) : 68 - 73
  • [3] Oman Construction Industry Prospective on Cause of Construction Material Waste
    Latif, Qadir Bux Alias Imran
    Al Batashi, Thuraya Bal Arab
    Qureshi, Kam Ran Latif
    [J]. INTERNATIONAL JOURNAL OF INTEGRATED ENGINEERING, 2020, 12 (01): : 243 - 252
  • [4] Development of a Risk Assessment Model for Oman Construction Industry
    Yafai, K. N.
    Hassan, J. S.
    Balubaid, S.
    Zin, R. M.
    Hainin, M. R.
    [J]. JURNAL TEKNOLOGI, 2014, 70 (07):
  • [5] Substantial Factors of Construction Management Causes Budget Overrun in Construction Industry of Oman
    Latif, Qadir Bux Alias Imran
    Gopang, Raja Khan Mohammed
    Rahman, Ismai Abdul
    [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2020, 11 (02): : 196 - 203
  • [6] Delay mitigation in the Malaysian construction industry
    Abdul-Rahman, H
    Berawi, MA
    Berawi, AR
    Mohamed, O
    Othman, M
    Yahya, IA
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (02) : 125 - 133
  • [7] CAUSES OF DELAY IN INDIAN CONSTRUCTION INDUSTRY
    Venkatesh, M. P.
    Renuka, S. M.
    Umarani, C.
    [J]. ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2768 - 2773
  • [8] Causes of Delay in Construction Industry in Iran
    Kouchaknezhad, Mehran
    Ali, Abang Abdullah Abang
    Kadir, Mohammad Razali Abdul
    [J]. INTERNATIONAL CONSTRUCTION BUSINESS & MANAGEMENT SYMPOSIUM 2011: WINNING & SUSTAINABLE STRATEGIES FOR INTERNATIONAL PROJECTS, 2011, : 211 - 217
  • [9] Towards a sustainable construction industry: Delays and cost overrun causes in construction projects of Oman
    Al Amri, Tariq
    Marey-Perez, Manuel
    [J]. JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (02) : 87 - 102
  • [10] An overview of the risk of delay in Cyprus construction industry
    Vacanas, Yiannis
    Danezis, Chris
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 21 (04) : 369 - 381