Substantial Factors of Construction Management Causes Budget Overrun in Construction Industry of Oman

被引:2
|
作者
Latif, Qadir Bux Alias Imran [1 ]
Gopang, Raja Khan Mohammed [2 ,3 ]
Rahman, Ismai Abdul [2 ]
机构
[1] Univ Nizwa, Coll Engn & Architecture, Dept Civil & Environm Engn, POB 33, Nizwa 616, Oman
[2] Univ Tun Hussein Onn Malaysia UTHM, Fac Civil Engn & Built Environm, Parit Raja 86400, Malaysia
[3] Riyadh Metro PMCM, Riyadh Metro Project Oruba Site Complex,POB 6601, Riyadh 11586, Saudi Arabia
关键词
Construction; Costoverrun; causes; factors; Oman; Management; budget; COST OVERRUN; PROJECTS;
D O I
10.30880/ijscet.2020.11.02.024
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction development industry's principle objective is to guarantee that the schemesfinish on time inside financial plan, and accomplish diverseobjectives. Construction project endsinside spending plan, is basic worries in development the board, and imagined as most significant limitations for estimating achievement of any development venture. Budget overrun can be defined as the actual extra amount that is spenton a project than was planned in the budget. This budget overrun required extra financial expenditure. The root cause factors of budget overrun due to construction management and highlighted with reason and recommendation. The main objective of this study is to clarify the factors that causes budget overrun in construction project at Muscat, Khabourah, Bidbid, Musanah and Sohar cities in Oman. The quantitative analysis is carried out by interviewing construction experts working as consultant, contractors and project client in Oman via questionnaire. The collected data is analyzed by using average index method to determine the substantial factors causing budget overrun in construction projects.
引用
收藏
页码:196 / 203
页数:8
相关论文
共 50 条
  • [1] Towards a sustainable construction industry: Delays and cost overrun causes in construction projects of Oman
    Al Amri, Tariq
    Marey-Perez, Manuel
    [J]. JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (02) : 87 - 102
  • [2] Time-overrun factors in Nigerian construction industry
    Elinwa, AU
    Joshua, M
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (05): : 419 - 425
  • [3] Categorization of potential project cost overrun factors in construction industry
    Karunakaran, P.
    Abdullah, A. H.
    Nagapan, S.
    Sohu, S.
    Kasvar, K. K.
    [J]. 4TH INTERNATIONAL CONFERENCE ON CIVIL AND ENVIRONMENTAL ENGINEERING FOR SUSTAINABILITY (ICONCEES 2017), 2018, 140
  • [5] Causes of construction accidents in Oman
    Umar, Tariq
    Egbu, Charles
    [J]. MIDDLE EAST JOURNAL OF MANAGEMENT, 2018, 5 (01) : 21 - 33
  • [6] Causes of Construction Projects Cost Overrun in Brazil
    Franca, Alda
    Haddad, Assed
    [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2018, 9 (01): : 69 - 83
  • [7] Fuzzy assessment of the risk factors causing cost overrun in construction industry
    Savita Sharma
    Pradeep K. Goyal
    [J]. Evolutionary Intelligence, 2022, 15 : 2269 - 2281
  • [8] Fuzzy assessment of the risk factors causing cost overrun in construction industry
    Sharma, Savita
    Goyal, Pradeep K.
    [J]. EVOLUTIONARY INTELLIGENCE, 2022, 15 (04) : 2269 - 2281
  • [9] Time and Cost Overrun in Construction Projects in Ecuador: Main Causes and Risk Factors
    Manzano-Alvarado, Mateo
    Montalban-Domingo, Laura
    Garcia-Segura, Tatiana
    Sanz-Benlloch, Amalia
    Pellicer, Eugenio
    [J]. CONSTRUCTION RESEARCH CONGRESS 2024: CONTRACTING, DELIVERY, SCHEDULING, ESTIMATING, ECONOMICS, AND ORGANIZATIONAL MANAGEMENT AND PLANNING IN CONSTRUCTION, 2024, : 238 - 244
  • [10] Factors contributing to project time and hence cost overrun in the Malaysian construction industry
    Shehu, Zayyana
    Endut, Intan
    Akintoye, Akintola
    [J]. JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2014, 19 (01) : 55 - +