Identification of Delay Factor in Oman Construction Industry

被引:6
|
作者
Latif, Qadir Bux Alias Imran [1 ]
Al Saadi, Aysha Mehfoodh Dhiyab [1 ]
Rahman, Ismail Abdul [2 ]
机构
[1] Univ Nizwa, Coll Engn, Dept Civil Engn, POB 33, Nizwa 616, Oman
[2] Univ Tun Hussein Onn Malaysia UTHM, Fac Civil & Environm Engn, Parit Raja 86400, Malaysia
关键词
delay; time overrun; construction; causes; factors; management; Muscat; Oman; PROJECTS;
D O I
10.30880/ijscet.2019.10.01.004
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction industry is second most significant and largest industry in gulf countries that continuously and rapidly growing. However the decline in economies of gulf countries due to fluctuated oil has ambiguous effect on the construction industry. Like other countries around the world, construction industries in gulf region also facing many problems and amongst the most common problem is delay/time overrun. This paper aims to identify various factors in construction management which causing delay in construction projects at Muscat, Khabourah, Bidbid, Musanah and Sohar cities in OMAN. Fourty eight (48) delay factors identified from literature around the world and organized in structured questionnaire survey form. Delay factors were categorized into five major groups in construction process which are Planning, Design, Construction, Finishing, and Miscellaneous. The forms were distributed amongst the construction experts focusing clients, consultants and contractors involved in the construction projects. A total of 105 collected data were analyzed by using Average Index method for each factor. Furthermore, delay causing factors analyzed by individual response of client, consultant and contractor prospective. The analysis identified that 'changes in scope of project', 'lack of communication between parties', 'shortage of skilled labour', 'mistakes during construction', and 'insufficient data collection and survey before designing'; are the most significant causes in each category respectively. The result of this study is useful to create or/and improve guideline considering delay, to avoid problems in looming construction.
引用
收藏
页码:34 / 45
页数:12
相关论文
共 50 条
  • [31] Identification of factors affecting the accident rate in the construction industry
    Hola, Bozena
    Nowobilski, Tomasz
    Szer, Iwona
    Szer, Jacek
    [J]. INNOVATIVE SOLUTIONS IN CONSTRUCTION ENGINEERING AND MANAGEMENT: FLEXIBILITY IN SUSTAINABLE CONSTRUCTION, 2017, 208 : 35 - 42
  • [32] The Identification and Management of Major Risks in the Malaysian Construction Industry
    Goh, Cheng Siew
    Abdul-Rahman, Hamzah
    [J]. JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2013, 18 (01) : 19 - 32
  • [33] Identification of parameters and indicators for implementing circularity in the construction industry
    Kazmi R.
    Chakraborty M.
    [J]. J. Eng. Appl. Sci., 2023, 1 (1):
  • [34] Identification and description of relevant digital technologies for the construction industry
    Haghsheno, S.
    Deubel, M.
    Spenner, L.
    [J]. BAUINGENIEUR, 2019, 94 (02): : 45 - 55
  • [35] A cartography of delay risks in the Australian construction industry: impact, correlations and timing
    Derakhshanfar, Hossein
    Ochoa, J. Jorge
    Kirytopoulos, Konstantinos
    Mayer, Wolfgang
    Langston, Craig
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (07) : 1952 - 1978
  • [36] An Investigation of Causes of Delay Affecting the United Arab Emirates Construction Industry
    AlGheth, Abdulhamid
    Sayuti, Md Ishak
    [J]. PROCEEDINGS OF AICCE'19: TRANSFORMING THE NATION FOR A SUSTAINABLE TOMORROW, 2020, 53 : 403 - 413
  • [37] Identification and severity assessment of challenges in the adoption of industry 4.0 in Indian construction industry
    Singh, Arpit
    Kumar, Vimal
    Verma, Pratima
    Kandasamy, Jayakrishna
    [J]. ASIA PACIFIC MANAGEMENT REVIEW, 2023, 28 (03) : 299 - 315
  • [38] Identification of Critical Barriers in Implementing Lean Construction Practices in Indian Construction Industry
    Ragavi Prabaharan
    S. Shanmugapriya
    [J]. Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2023, 47 : 1233 - 1249
  • [39] Sales and marketing - the success factor in the building and construction industry
    Beutin, Nikolas
    Becher, Manuel
    Kiunke, Jens
    [J]. Betonwerk und Fertigteil-Technik/Concrete Plant and Precast Technology, 2008, 74 (01): : 40 - 43
  • [40] Factor Analysis of Inventory Management in Thai Construction Industry
    Jakkraphobyothin, Kanyanat
    Srifa, Suparat
    Chinda, Thanwadee
    [J]. 2018 3RD TECHNOLOGY INNOVATION MANAGEMENT AND ENGINEERING SCIENCE INTERNATIONAL CONFERENCE (TIMES-ICON), 2018,