共 50 条
- [42] The NEW detector: construction, commissioning and first results XXVII INTERNATIONAL CONFERENCE ON NEUTRINO PHYSICS AND ASTROPHYSICS (NEUTRINO2016), 2017, 888
- [43] Commissioning and first results of the Fermilab Muon Campus PHYSICAL REVIEW ACCELERATORS AND BEAMS, 2019, 22 (01):
- [44] First commissioning results from Hall A at TJNAF INTERSECTIONS BETWEEN PARTICLE AND NUCLEAR PHYSICS - 6TH CONFERENCE, 1997, (412): : 307 - 310
- [45] The beam dump materials and their LIDT measurements for PW/multi-PW laser systems SHORT-PULSE HIGH-ENERGY LASERS AND ULTRAFAST OPTICAL TECHNOLOGIES, 2019, 11034
- [47] A NEW MACROMOLECULAR CRYSTALLOGRAPHY STATION (9.5) ON THE SRS WIGGLER BEAM LINE FOR VERY RAPID LAUE AND RAPIDLY TUNABLE MONOCHROMATIC MEASUREMENTS - COMMISSIONING AND FIRST RESULTS REVIEW OF SCIENTIFIC INSTRUMENTS, 1992, 63 (01): : 1062 - 1064
- [48] Commissioning of the ATLAS detector and combined beam test results NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2007, 572 (01): : 113 - 116
- [49] Results of the commissioning of the Pion Beam Factory at SIS/GSI EXPERIMENTAL NUCLEAR PHYSICS IN EUROPE: ENPE 99: FACING THE NEXT MILLENNIUM, 1999, 495 : 401 - 402
- [50] Laser Integration Line target diagnostics first results (invited) REVIEW OF SCIENTIFIC INSTRUMENTS, 2006, 77 (10):