First commissioning results of the Apollon laser on the 1 PW beam line

被引:0
|
作者
Papadopoulos, D. N. [1 ]
Zou, J. P. [1 ]
Le Blanc, C. [1 ]
Ranc, L. [1 ,2 ,3 ]
Druon, F. [3 ]
Martin, L. [1 ]
Freneaux, A. [1 ]
Beluze, A. [1 ]
Lebas, N. [1 ]
Chabanis, M. [1 ]
Bonnin, C. [1 ]
Accary, J. B. [1 ]
Garrec, B. L. [1 ]
Mathieu, F. [1 ]
Audebert, P. [1 ]
机构
[1] CEA, Ecole Polytech, CNRS, Lab Utilisat Lasers Intenses, Palaiseau, France
[2] THALES FRANCE SAS, Elancourt, France
[3] Univ Paris Saclay, CNRS, Inst Opt, Lab Charles Fabry, Palaiseau, France
关键词
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The Apollon 10 PW laser has recently demonstrated its capacity of generating > 1 PW pulses with < 22 fs duration. The complete commissioning results of the 1 PW beam line will be presented in this work. (c) 2019 The Author(s)
引用
收藏
页数:2
相关论文
共 50 条
  • [31] Beam line 1411 at MAX II -: performance and first results
    Bässler, M
    Ausmees, A
    Jurvansuu, M
    Feifel, R
    Forsell, JO
    Fonseca, PD
    Kivimäki, A
    Sundin, S
    Sorensen, SL
    Nyholm, R
    Björneholm, O
    Aksela, S
    Svensson, S
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2001, 469 (03): : 382 - 393
  • [32] Commissioning and first results of the ITER-relevant negative ion beam test facility ELISE
    Franzen, P.
    Heinemann, B.
    Fantz, U.
    Wuenderlich, D.
    Kraus, W.
    Froeschle, M.
    Martens, C.
    Riedl, R.
    Nocentini, R.
    Masiello, A.
    Ruf, B.
    Schiesko, L.
    Wimmer, C.
    FUSION ENGINEERING AND DESIGN, 2013, 88 (12) : 3132 - 3140
  • [33] Commissioning of the LHC beam transfer line TI 8
    Uythoven, J
    Arduini, G
    Goddard, B
    Jacquet, D
    Kain, V
    Lamont, M
    Mertens, V
    Spinks, A
    Wenninger, J
    2005 IEEE PARTICLE ACCELERATOR CONFERENCE (PAC), VOLS 1-4, 2005, : 2843 - 2845
  • [34] Commissioning an experimental beam line for in vivo FLASH experiments
    Kim, M.
    RADIOTHERAPY AND ONCOLOGY, 2022, 170 : S163 - S163
  • [35] Commissioning of the Fermilab electron cooler prototype beam line
    Seletsky, S
    Burov, AV
    Carlson, K
    Leibfritz, J
    Kramper, B
    Kroc, T
    McGee, M
    Nagaitsev, S
    Saewert, G
    Schmidt, CW
    Shemyakin, A
    Warner, A
    Tupikov, V
    PROCEEDINGS OF THE 2003 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 2003, : 2020 - 2022
  • [36] Commissioning of the first KSTAR neutral beam injection system and beam experiments
    Bae, Y. S.
    Park, Y. M.
    Kim, J. S.
    Han, W. S.
    Kwak, S. W.
    Chang, Y. B.
    Park, H. T.
    Song, N. H.
    Yang, H. L.
    Yoon, S. W.
    Jeon, Y. M.
    Hahn, S. H.
    Lee, S. G.
    Ko, W. H.
    England, A. C.
    Kim, W. C.
    Oh, Y. K.
    Kwak, J. G.
    Kwon, M.
    Chang, D. H.
    Jeong, S. H.
    Kim, T. S.
    Oh, B. H.
    Jin, J. T.
    In, S. R.
    Lee, K. W.
    Chang, D. S.
    Watanabe, K.
    Dairaku, M.
    Tobari, H.
    Kashiwagi, M.
    Hanada, M.
    Inoue, T.
    Ikeda, Y.
    Kawai, M.
    Komata, M.
    Mogaki, K.
    Usui, K.
    Yamamoto, T.
    Matsuoka, M.
    Nagaoka, K.
    Grisham, L.
    FUSION ENGINEERING AND DESIGN, 2012, 87 (09) : 1597 - 1610
  • [37] MIDI - First results from commissioning on paranal
    Przygodda, F
    Chesneau, O
    Leinert, C
    Graser, U
    Neumann, U
    Jaffe, W
    Bakker, E
    de Jong, JA
    Morel, S
    TOWARDS OTHER EARTHS: DARWIN/TPF AND THE SEARCH FOR EXTRASOLAR TERRESTRIAL PLANETS, PROCEEDINGS, 2003, 539 : 549 - 553
  • [38] Commissioning and first results of the LNLS XAFS beamline
    Tolentino, H
    Cezar, JC
    Cruz, DZ
    Compagnon-Cailhol, V
    Tamura, E
    Alves, MCM
    JOURNAL OF SYNCHROTRON RADIATION, 1998, 5 : 521 - 523
  • [39] EMIR at the GTC: results on the first commissioning at the telescope
    Garzon, F.
    Castro, N.
    Insausti, M.
    Manjavacas, E.
    Miluzio, M.
    Hammersley, Peter
    Cardiel, N.
    Pascual, S.
    Gonzalez-Fernandez, C.
    Molgo, J.
    Barreto, M.
    Fernandez, P.
    Joven, E.
    Lopez, P.
    Mato, A.
    Moreno, H.
    Nunez, M.
    Patron, J.
    Rosich, J.
    Vega, N.
    GROUND-BASED AND AIRBORNE INSTRUMENTATION FOR ASTRONOMY VI, 2016, 9908
  • [40] First Commissioning Results of the KSTAR Cryogenic System
    Kim, Yaung-Soo
    Park, Y. M.
    Lee, Y. J.
    Kwag, S. W.
    Chang, Y. B.
    Song, N. H.
    Woo, I. S.
    Park, H. T.
    Cho, K. W.
    Chang, H. S.
    Park, D. S.
    Joo, J. J.
    Moon, K. M.
    Park, K. R.
    Chu, Yong
    Yonekawa, Hirofumi
    Kim, Y. O.
    Bang, E. N.
    Kim, H. K.
    Kim, K. P.
    Park, M. K.
    Baek, S.
    Hong, J. S.
    Ha, T. H.
    Kim, Y. J.
    Hwang, I. S.
    Yang, H. L.
    Oh, Y. K.
    Bak, J. S.
    Kwon, M.
    Lee, G. S.
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2009, 19 (03) : 1577 - 1581