Serial Production Lines With Waiting Time Limits: Bernoulli Reliability Model

被引:14
|
作者
Lee, Jun-Ho [1 ]
Li, Jingshan [2 ]
Horst, John A. [3 ]
机构
[1] Konkuk Univ, Sch Business, Seoul 05029, South Korea
[2] Univ Wisconsin, Dept Ind & Syst Engn, Madison, WI 53706 USA
[3] NIST, Engn Lab, Gaithersburg, MD 20899 USA
关键词
Bernoulli machine; buffer design; iteration algorithm; performance evaluation; waiting time constraint; SYSTEM-THEORETIC PROPERTIES; PERFORMANCE EVALUATION; MANUFACTURING SYSTEMS; BUFFER CAPACITY; TRANSIENT ANALYSIS; ALLOCATION; IMPROVEMENT; IMPROVABILITY; THROUGHPUT; ALGORITHM;
D O I
10.1109/TEM.2017.2769059
中图分类号
F [经济];
学科分类号
02 ;
摘要
Production systems with waiting time constraints are frequently encountered in semiconductor, automotive, battery, food, and many other manufacturing industries. Under the waiting time constraints, the residence time of in-process inventories is constrained by a predetermined time limit. A part exceeding the maximal time limit has to be inspected for quality assurance and it is subject to be scrapped with a certain probability. In this paper, performance evaluation of Bernoulli serial lines with waiting time limits is studied. Analytical formulas are derived to predict the system performance of two-machine lines in steady state. For longer lines, direct analysis is no longer viable due to high complexity, thus an aggregation-based iterative procedure is introduced. Based on extensive numerical studies, the convergence of the procedure can be observed and high accuracy in performance estimation is achieved. In addition, to design such lines, an efficient procedure for near optimal buffer assignment to maximize production rate is also proposed. Analogously, we first propose an exact algorithm for two-machine lines and then extend it to a recursive procedure for longer lines. We then numerically verify that the procedure provides a near optimal solution within a very short computation time. Finally, the impacts of relaxing waiting time constraints on line performance and buffer design are discussed, and operational strategies to achieve better performance are also presented.
引用
收藏
页码:316 / 329
页数:14
相关论文
共 50 条
  • [1] Performance Evaluation of Bernoulli Serial Lines with Waiting Time Constraints
    Lee, Jun-Ho
    Li, Jingshan
    [J]. IFAC PAPERSONLINE, 2017, 50 (01): : 1087 - 1092
  • [2] Transient Analysis of Serial Production Lines With Perishable Products: Bernoulli Reliability Model
    Ju, Feng
    Li, Jingshan
    Horst, John A.
    [J]. IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 2017, 62 (02) : 694 - 707
  • [3] An Indirect Estimation of Machine Parameters for Serial Production Lines with Bernoulli Reliability Model
    Kim, Seunghyeon
    Won, Yuchang
    Park, Kyung-Joon
    Eun, Yongsoon
    [J]. 2020 59TH IEEE CONFERENCE ON DECISION AND CONTROL (CDC), 2020, : 5540 - 5545
  • [4] Reducing energy consumption in serial production lines with Bernoulli reliability machines
    Su, Wen
    Xie, Xiaolei
    Li, Jingshan
    Zheng, Li
    Feng, Shaw C.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (24) : 7356 - 7379
  • [5] Analysis, design, and control of Bernoulli production lines with waiting time constraints
    Lee, Jun-Ho
    Zhao, Cong
    Li, Jingshan
    Papadopoulos, Chrissoleon T.
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 2018, 46 : 208 - 220
  • [6] Iteration Algorithms for Performance Evaluation and Buffer Design of Bernoulli Serial Lines with Waiting Time Constraints
    Lee, Jun-Ho
    Li, Jingshan
    Horst, John A.
    [J]. 2017 13TH IEEE CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2017, : 654 - 655
  • [7] Lean buffering in serial production lines with Bernoulli machines
    Hu, A. B.
    Meerkov, S. M.
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2006, 2006
  • [8] Transient behavior of serial production lines with Bernoulli machines
    Meerkov, Semyon M.
    Zhang, Liang
    [J]. IIE TRANSACTIONS, 2008, 40 (03) : 297 - 312
  • [9] Dynamic Bottleneck in Serial Production Lines with Bernoulli Machines
    Tu, Jiachen
    Bai, Yishu
    Yang, Mengzhuo
    Zhang, Liang
    Denno, Peter
    [J]. 2019 IEEE 15TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2019, : 79 - 84
  • [10] Raw material release rates to ensure desired production lead time in Bernoulli serial lines
    Biller, Stephan
    Meerkov, Semyon M.
    Yan, Chao-Bo
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (14) : 4349 - 4364