Analysis, design, and control of Bernoulli production lines with waiting time constraints

被引:22
|
作者
Lee, Jun-Ho [1 ]
Zhao, Cong [2 ]
Li, Jingshan [2 ]
Papadopoulos, Chrissoleon T. [3 ]
机构
[1] Konkuk Univ, Sch Business, Seoul 05029, South Korea
[2] Univ Wisconsin, Dept Ind & Syst Engn, Madison, WI 53706 USA
[3] Nazarbayev Univ, Master Engn Management Program, Sch Engn, Astana 010000, Kazakhstan
关键词
Time constraint; Yield analysis; Bernoulli machine; Optimal buffer design; Production control; AUTOMATIC TRANSFER LINES; SERIAL PRODUCTION LINES; CLUSTER TOOLS; PERFORMANCE EVALUATION; MANUFACTURING SYSTEMS; 2-MACHINE FLOWSHOP; INVENTORY SYSTEMS; BUFFER CAPACITY; PETRI-NET; ALLOCATION;
D O I
10.1016/j.jmsy.2018.01.001
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Waiting time constraints between two processes are one of common scheduling requirements in many production systems, such as semiconductor, automotive, food, and battery manufacturing. When the time constraints are introduced, quality inspection should be carried out on parts that have exceeded a given time limit and such parts are subject to be re-processed or scrapped, which incurs additional expenses and efforts. Therefore, the foremost goal is to maximize yield, which is defined by the production rate of parts that do not violate the time constraints. In this paper, we present a mathematical model of Bernoulli production lines to evaluate yield and examine its properties with respect to time constraints, buffer capacity, and machine reliability. System properties such as monotonicity and asymptotic characteristics are analyzed. With the analysis results, an efficient algorithm to design an optimal buffer capacity is developed. It is shown that, in contrast to traditional production lines, there is no monotonicity of yield on the reliability of an upstream machine; that is, an upstream machine becoming more reliable does not always contribute to increasing yield. Therefore, optimal control policies are presented to control the upstream machine for maximal yield. Finally, a case study is introduced to illustrate the applicability of the method. (C) 2018 Published by Elsevier Ltd on behalf of The Society of Manufacturing Engineers.
引用
收藏
页码:208 / 220
页数:13
相关论文
共 50 条
  • [1] Performance Evaluation of Bernoulli Serial Lines with Waiting Time Constraints
    Lee, Jun-Ho
    Li, Jingshan
    [J]. IFAC PAPERSONLINE, 2017, 50 (01): : 1087 - 1092
  • [2] Iteration Algorithms for Performance Evaluation and Buffer Design of Bernoulli Serial Lines with Waiting Time Constraints
    Lee, Jun-Ho
    Li, Jingshan
    Horst, John A.
    [J]. 2017 13TH IEEE CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2017, : 654 - 655
  • [3] Serial Production Lines With Waiting Time Limits: Bernoulli Reliability Model
    Lee, Jun-Ho
    Li, Jingshan
    Horst, John A.
    [J]. IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2018, 65 (02) : 316 - 329
  • [4] Cellular Production Lines With Asymptotically Reliable Bernoulli Machines: Lead Time Analysis and Control
    Meerkov, Semyon M.
    Yan, Chao-Bo
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2015, 12 (02) : 764 - 768
  • [5] Cellular Production Lines with Asymptotically Reliable Bernoulli Machines: Performance Analysis and Lead Time Control
    Meerkov, Scmyon M.
    Yan, Chao-Bo
    [J]. 2013 IEEE 52ND ANNUAL CONFERENCE ON DECISION AND CONTROL (CDC), 2013, : 5468 - 5473
  • [6] Feedback Release Control of Bernoulli Production Lines
    Zhang, Liang
    [J]. 2011 9TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA 2011), 2011, : 564 - 569
  • [7] Job Dispatch Control for Production Lines With Overlapped Time Window Constraints
    Wang, Mengchang
    Srivathsan, Sandeep
    Huang, Edward
    Wu, Kan
    [J]. IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2018, 31 (02) : 206 - 214
  • [8] Performance Analysis of Bernoulli Serial Production Lines with Switch-On/Off Machine Control
    Jia, Zhiyang
    Zhang, Liang
    Arinez, Jorge
    Xiao, Guoxian
    [J]. 2015 INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2015, : 477 - 482
  • [9] Optimization of buffer for series production systems with waiting time constraints
    Li, Rui
    Zhao, Ning
    Liu, Wen-Qi
    [J]. Kongzhi yu Juece/Control and Decision, 2018, 33 (02): : 345 - 350
  • [10] Performance Analysis of Bernoulli Serial Lines With Small Batch Production and Machine Switch On/Off Control
    Jia, Zhiyang
    Tian, Xiuxuan
    Wang, Zunjun
    Wang, Gang
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2024,