Performance Evaluation of Bernoulli Serial Lines with Waiting Time Constraints

被引:2
|
作者
Lee, Jun-Ho [1 ]
Li, Jingshan [2 ]
机构
[1] Konkuk Univ, Sch Business, Seoul 05029, South Korea
[2] Univ Wisconsin, Dept Ind & Syst Engn, Madison, WI 53706 USA
来源
IFAC PAPERSONLINE | 2017年 / 50卷 / 01期
关键词
Time constraint; performance evaluation; Bernoulli machine; yield analysis; MANUFACTURING SYSTEMS; TRANSIENT ANALYSIS; DESIGN;
D O I
10.1016/j.ifacol.2017.08.387
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Manufacturing systems with waiting time constraints are widely observed in battery, automotive, semiconductor, food and many other industries. Under such requirements, the residence time of a part in a buffer is constrained by a given time limit and the part exceeding the limit is subject to quality inspection and could be scrapped with a certain probability. To evaluate the performance of such systems, in this paper, we study Bernoulli serial lines with waiting time limits. For two-machine lines, analytical formulas are derived to predict the system performance in the steady state. In case of longer lines, direct analysis is intractable, thus an iterative aggregation procedure is presented. Based on extensive numerical experiments, the convergent results of the procedure can be obtained and high precision in performance estimation is achieved. (C) 2017, IFAC (International Federation of Automatic Control) Hosting by Elsevier Ltd. All rights reserved.
引用
收藏
页码:1087 / 1092
页数:6
相关论文
共 50 条
  • [1] Iteration Algorithms for Performance Evaluation and Buffer Design of Bernoulli Serial Lines with Waiting Time Constraints
    Lee, Jun-Ho
    Li, Jingshan
    Horst, John A.
    [J]. 2017 13TH IEEE CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2017, : 654 - 655
  • [2] Serial Production Lines With Waiting Time Limits: Bernoulli Reliability Model
    Lee, Jun-Ho
    Li, Jingshan
    Horst, John A.
    [J]. IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2018, 65 (02) : 316 - 329
  • [3] Analysis, design, and control of Bernoulli production lines with waiting time constraints
    Lee, Jun-Ho
    Zhao, Cong
    Li, Jingshan
    Papadopoulos, Chrissoleon T.
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 2018, 46 : 208 - 220
  • [4] Performance Evaluation of Bernoulli Serial Lines with Batching Machines
    Wang, Jun-Qiang
    Yan, Fei-Yi
    Cui, Peng-Hao
    Xia, Tian
    [J]. 2017 13TH IEEE CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2017, : 295 - 295
  • [5] A Finite State Method in the Performance Evaluation of the Bernoulli Serial Production Lines
    Hadzic, Neven
    Lozar, Viktor
    Abdulaj, Filip
    [J]. APPLIED SCIENCES-BASEL, 2020, 10 (18):
  • [6] Transient analysis of Bernoulli serial lines: performance evaluation and system-theoretic properties
    Zhang, Liang
    Wang, Chuanfeng
    Arinez, Jorge
    Biller, Stephan
    [J]. IIE TRANSACTIONS, 2013, 45 (05) : 528 - 543
  • [7] Bernoulli serial lines with deteriorating product quality: performance evaluation and system-theoretic properties
    Naebulharam, Raed
    Zhang, Liang
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (05) : 1479 - 1494
  • [8] Bottlenecks in Bernoulli Serial Lines With Rework
    Biller, Stephan
    Li, Jingshan
    Marin, Samuel P.
    Meerkov, Semyon M.
    Zhang, Liang
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2010, 7 (02) : 208 - 217
  • [9] An Improved Aggregation Method for Performance Analysis of Bernoulli Serial Production Lines
    Yan, Fei-Yi
    Wang, Jun-Qiang
    Li, Yang
    Cui, Peng-Hao
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2021, 18 (01) : 114 - 121
  • [10] Transient Performance Evaluation with Finite Production Run-based Serial Lines: Bernoulli Quality Model
    Ma, Chiye
    Jia, Zhiyang
    Wang, Xiaohan
    Ni, Zejun
    [J]. 2021 INTERNATIONAL CONFERENCE ON CYBER-PHYSICAL SOCIAL INTELLIGENCE (ICCSI), 2021,