Two-Stage emergency material scheduling based on benders decomposition considering traffic congestion after a disaster

被引:4
|
作者
Hu, Hui [1 ]
Chen, Chaofeng [1 ]
Liu, Mengyuan [1 ]
Fu, Yihan [1 ]
Zhao, Jiao [1 ]
Feng, Zhiyu [1 ]
机构
[1] Changan Univ, Coll Transportat Engn, Xian 710061, Peoples R China
基金
中国国家自然科学基金; 国家重点研发计划;
关键词
Emergency material scheduling; Traffic congestion; GENERALIZED Benders decomposition (GBD); algorithm; Two-stage planning; FACILITY LOCATION; ALGORITHM; NETWORK; MODEL; DESIGN; TRANSPORTATION; ALLOCATION; PROGRAMS; SEARCH;
D O I
10.1016/j.cie.2022.108751
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This study establishes a stochastic mixed integer nonlinear programming model for a two-stage emergency multiclass material scheduling problem considering traffic congestion with a Bureau of Public Roads (BPR) function. The generalized Benders decomposition (GBD) algorithm is used to solve the model on the basis of the characteristics of the decomposable structure and nonlinear convex function. To prove the effectiveness of the GBD algorithm, we set up a 30-node medium-scale case and a 50-node large-scale case for experimental demonstration and compared the GBD algorithm with the simple branch and bound (SBB) and discrete and continuous optimization solvers. Results show that for the medium-scale experiment, the gap between the so-lution results of the GBD algorithm and the ones of SBB or other solvers is less than 0.2%. The solution time of the GBD algorithm is only half of the time of SBB and other solvers. The large-scale case of 50 nodes cannot be solved by the SBB or other solvers, whereas the GBD algorithm can solve it normally, and the results are reasonable. In large-scale cases with more than 50 nodes, the GBD algorithm is more effective and efficient compared with SBB and other solvers. The sensitivity of the correlation coefficient alpha in the BPR function was analyzed. The actual expected total cost increases with the increase in the value of alpha. Its solving results are accurate and reasonable, proving that the results are more practical and applicable after adding the BPR function.
引用
收藏
页数:18
相关论文
共 50 条
  • [1] Two-Stage emergency material scheduling based on benders decomposition considering traffic congestion after a disaster (vol 174, 108571, 2022)
    Hu, Hui
    Chen, Chaofeng
    Liu, Mengyuan
    Fu, Yihan
    Zhao, Jiao
    Feng, Zhiyu
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 179
  • [2] Extended Benders Decomposition for Two-Stage SCUC
    Liu, Cong
    Shahidehpour, Mohammad
    Wu, Lei
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2010, 25 (02) : 1192 - 1194
  • [3] Two-Stage Fuzzy Traffic Congestion Detector
    Erdinc, Gizem
    Colombaroni, Chiara
    Fusco, Gaetano
    FUTURE TRANSPORTATION, 2023, 3 (03): : 840 - 857
  • [4] Combinatorial Benders decomposition for melted material blending systems considering transportation and scheduling
    Eom, Myungeun
    Kim, Byung-In
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2023, 61 (10) : 3481 - 3503
  • [5] Two-stage scenario-based DEP incorporating PEV using Benders' decomposition
    Abdi-Siab, Majid
    Lesani, Hamid
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2020, 14 (08) : 1508 - 1520
  • [6] Similarity-based decomposition algorithm for two-stage stochastic scheduling
    Montes, Daniel
    Pitarch, Jose Luis
    de Prada, Cesar
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 194
  • [7] A two-stage robust hub location problem with accelerated Benders decomposition algorithm
    Rahmati, Reza
    Bashiri, Mahdi
    Nikzad, Erfaneh
    Siadat, Ali
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2022, 60 (17) : 5235 - 5257
  • [8] Multi-project scheduling with two-stage decomposition
    Anıl Can
    Gündüz Ulusoy
    Annals of Operations Research, 2014, 217 : 95 - 116
  • [9] Multi-project scheduling with two-stage decomposition
    Can, Anil
    Ulusoy, Gunduz
    ANNALS OF OPERATIONS RESEARCH, 2014, 217 (01) : 95 - 116
  • [10] Two-stage online distribution strategy of emergency material
    Yu, Hui
    Zhen, Xue-Ping
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2012, 32 (09): : 1924 - 1931